ATS Pious Orchards Review 2026: Sector 150 Noida — RERA, Sports City Condition & Buyer Risks
This review is based on information available at the time of research. Always conduct your own due diligence before making any purchase decision.
This ATS Pious Orchards Review looks beyond the ATS Homekraft brand and the Sector 150 address to examine what the official records actually show. ATS Pious Orchards is a ten-tower project in Sector 150, Noida, built on a Sports City sub-plot. Its towers have reached full structural height, but the building sanction carries a Sports City condition affecting part of one tower, while the permit record on UP-RERA raises a question that buyers should resolve before making a payment. For a project at this stage, the paperwork matters as much as the progress photographs.
This review is based primarily on the project’s official UP-RERA filings, including its registration details, quarterly progress reports, approved plans and document index. It also examines the Noida Authority building sanction and approved site plan, the registered sub-lease deed and development agreement forming the land-title chain, the Environmental Clearance, the encumbrance report and the promoter’s proforma buyer documents.
For wider locality and Sports City context, we refer to named reports from Hindustan Times, ET Realty, ET Infra and The Times of India, as well as a CAG audit report and clearly identified locality commentary. Builder brochures and broker summaries have not been treated as evidence.
Project at a Glance
| Parameter | Details |
| Project Name | Pious Orchards (marketed as ATS Homekraft Pious Orchards) |
| Legal Entity (Promoter) | Homekraft Infra Private Limited (CIN: U70200DL2017PTC314287) |
| Location | Sports City Plot SC-02/J&K, Sector 150, Noida |
| UP-RERA Registration No. | UPRERAPRJ183246 |
| RERA Registration Date | 8 October 2021 |
| Registered Office (Promoter) | 711/92, Deepali, Nehru Place, New Delhi – 110019 |
| Project Type | High-rise residential (marketed as luxury) |
| Land Area (This Project) | 37,672.89 sq. m (approx. 9.3 acres) |
| Development Context | Shares the 72,000 sq. m Sports City sub-plot SC-02/J&K with Pious Hideaways (UPRERAPRJ442430); land held on sub-lease by Fest Homes Developers Pvt Ltd |
| Towers / Units | 10 towers — Towers 1, 2, 8, 9 & 10: 3 BHK (carpet 132.85 sq. m); Towers 3–7: 4 BHK (carpet 189.52 sq. m); 608 apartments + 9 shops |
| Declared Project Cost | ₹728.04 crore (UP-RERA); ₹829.12 crore in the CA certificate for September 2026 |
| UP-RERA Project Duration | 84 months (proposed start 1 October 2021) |
| Declared Completion Date | 30 September 2028 |
| Construction & Development Completion | 75.01% (Engineer/CA certified, quarter ending 30 September 2026) |
| Cost-Proportionate Completion | 83.08% (CA certified, quarter ending 30 September 2026) |
| Commencement Certificate | Not independently verifiable from the documents reviewed |
| Escrow Bank | ICICI Bank, Sector 18, Noida — Collection and Separate accounts |
Location Analysis for ATS Pious Orchards, Sector 150
Sector 150 sits on the Noida–Greater Noida Expressway and is made up largely of high-rise residential developments. Pious Orchards is on Sports City sub-plot SC-02/J&K, which it shares with Pious Hideaways. As with any project in this sector, the useful question is not whether Sector 150 is an established residential location. The question is what this particular site, and the Sports City framework it sits within, mean for a buyer.

Road & Expressway Connectivity
Road connectivity is one of Sector 150’s main strengths. The Noida–Greater Noida Expressway is the sector’s commuting spine, linking it with Noida’s commercial sectors and onward routes to Delhi and Greater Noida. For buyers who commute by car, it is the route that will shape most daily journeys.
The approved site plan filed with UP-RERA shows the SC-02/J&K plot bordered by a 45-metre-wide Pushta Road, a 30-metre road and a 15-metre road. Being close to the Expressway does not necessarily mean the drive onto it is short. How quickly residents can reach it depends on the sector roads linking the plot to it and on traffic at the junctions along the way.

Because the plot is positioned alongside the Pushta Road, the condition of this road is particularly relevant to Pious Orchards and its residents. In February 2026, Hindustan Times and ET Infra reported plans to repair and resurface an 11.5-km stretch of the Yamuna Pushta Road at an estimated cost of ₹30 crore. ET Infra described the existing stretch as potholed, and both reports said there were plans to extend or upgrade the road towards Sector 150 to ease pressure on the Expressway. These are announced works; buyers should check the road’s actual condition during a site visit rather than rely on the plans.

📰 Source: Hindustan Times (27 February 2026). Noida set to spend ₹30 cr to repair 11.5km Pushta Road. Read the full report →

📰 Source: ET Infra (27 February 2026). Noida set to repair Pushta Road to ease e-way gridlock. Read the full report →
MyReviewHub Note — Locality Issue vs. Project Issue: The road-condition and congestion concerns described above relate to the wider Sector 150 and Expressway corridor. In the official project material reviewed, we found no project-specific evidence of an incomplete approach road, right-of-way dispute or blocked legal access affecting Pious Orchards. Nevertheless, buyers should inspect the approach roads and actual access to the project during a site visit.
Metro Connectivity
The nearest operational Aqua Line metro access for Pious Orchards is at Sector 148. Residents will therefore need last-mile road transport to reach the station rather than having direct, doorstep metro connectivity. The actual convenience will depend on the availability of local transport and traffic conditions along the connecting roads.
A future improvement is planned through the Aqua Line extension from Sector 142 to Botanical Garden. According to the Press Information Bureau, the Union Cabinet approved this extension on 14 February 2026. Once completed, it is expected to improve metro connectivity between Greater Noida and the wider Noida metro network.
However, the extension is not currently available to residents. Buyers should assess Pious Orchards on the basis of existing metro access rather than assume that the proposed connectivity will be operational by the time they move in.
Schools & Education Nearby
Sector 150 does not yet have the concentration of established schools found in some of Noida’s older sectors. Families living at Pious Orchards can consider several schools along the Noida–Greater Noida Expressway corridor, including Shiv Nadar School (Sector 168), The Shriram Millennium School (Sector 135), Genesis Global School and Delhi Public School (Sector 132).
These options provide families with a choice of schools in the wider locality, but distances, actual travel times and admission availability have not been independently verified.
MyReviewHub Take — Good Options, But a Daily Drive: Families have a reasonable choice of schools along the Expressway corridor, but most options are unlikely to be within walking distance. Parents should check the actual commute during school hours and consider traffic conditions before making a buying decision
Hospitals & Healthcare
Major hospitals serving Sector 150 are located outside the sector. These include Felix Hospital (Sector 137), Yatharth Super Speciality Hospital (Sector 110) and Jaypee Hospital (Sector 128). Smaller clinics and pharmacies in the surrounding locality cater to routine healthcare needs. Travel times to these facilities have not been independently verified.
MyReviewHub Take — Accessible, But Outside Sector 150: Access to emergency and specialist care involves travelling outside Sector 150. Buyers with elderly family members, young children or regular medical needs should check the routes to their preferred hospitals and assess the journey during different traffic conditions.
Shopping, Groceries & Daily Life
Local grocery shops, pharmacies and delivery services cater to routine daily needs in and around Sector 150. However, larger retail, dining and entertainment options generally require travel towards Greater Noida or the more developed sectors of Noida. Examples include The Grand Venice Mall and Omaxe Connaught Place in Greater Noida.
Pious Orchards also has a small commercial block listed in its UP-RERA unit inventory, comprising nine shops: eight with carpet areas of 16.72 sq. m each and one measuring 27.41 sq. m. According to the September 2026 architect’s certificate, the commercial block’s superstructure was only 15% complete. These shops should therefore not be assumed to be ready for use or already serving residents.
MyReviewHub Take — Essentials Nearby, Lifestyle Retail Requires Travel: Sector 150’s quieter, predominantly residential character means residents will generally need to travel for larger shopping, dining and entertainment trips. The nine planned shops within Pious Orchards may eventually add some convenience, but buyers should not count on them as a substitute for established retail facilities nearby.
📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), “View Project in Detail” → “Details of Apartment/Flat/Shop/Plot” (Commercial block).
Open the UP-RERA portal →
To locate the inventory, search for UPRERAPRJ183246 and open “View Project in Detail”.
Drainage, Waterlogging & Air Quality
Drainage, waterlogging and dust pollution are among the civic concerns reported by residents in Sector 150. In an August 2026 report, The Times of India highlighted waterlogged greenbelts, damaged roads, poor sanitation and lighting issues across the sector.
Residents also reported that drains overflow regularly during the monsoon, flooding greenbelts that are otherwise littered with garbage. The report further described roads that are rarely cleaned and air that is heavy with dust. These accounts point to wider civic infrastructure and maintenance concerns in the locality, rather than establishing conditions specific to Pious Orchards.


📄 Source: The Times of India (16 August 2026). Dotted with condos, but Sector 150 pockmarked with broken roads, potholes, garbage heaps. Read the full report →
MyReviewHub Note — Locality Evidence, Not a Pious Orchards Defect Finding: The drainage, waterlogging, sanitation and air-quality concerns described above relate to Sector 150 and are based on residents’ accounts reported by The Times of India. We found no evidence in the material reviewed establishing a drainage, sewage or waterlogging defect within Pious Orchards. However, the project’s own sewage treatment plant (STP) was certified at 20% completion in September 2026. Buyers should verify its construction and operational status before possession.
Power Reliability in the Micro-Market
Sector 150 is served by Paschimanchal Vidyut Vitran Nigam Limited (PVVNL). Gautam Buddha Nagar’s electricity distribution records list a 33/11 kV substation for Sector 150, indicating the presence of local distribution infrastructure.
The UP-RERA project record states that individual units are proposed to receive electricity directly from the discom, while adding that this arrangement “may subject to change as per prevailing bylaws of discom”. Meanwhile, Pious Orchards’ own receiving station was certified at only 15% completion in September 2026.
MyReviewHub Note — Power Supply Arrangements Still Being Built: With the project’s receiving station certified at 15% completion and the project not yet occupied, its actual power reliability cannot currently be assessed. We found no reliable evidence establishing a recurring sector-level power supply problem. Buyers should verify the receiving station’s completion, backup power arrangements and electricity connection provisions before possession.
Investment Considerations
Sector 150 is no longer an early-stage location, and buyers should not assume that past property-price appreciation will continue at the same pace. Future returns will depend on factors such as project completion, infrastructure development, resale demand and the wider property market.
For Pious Orchards specifically, buyers should pay attention to the transfer conditions in the promoter’s proforma sub-lease deed. Resale, mortgage and other specified transfers require Noida Authority’s prior written consent and payment of applicable transfer charges, as set out in the document. These requirements may affect the paperwork, timing and cost involved in a future resale or financing transaction.
Buyers should therefore examine the final executed sub-lease deed, confirm the applicable transfer charges and consent requirements with Noida Authority, and factor these into their plans before purchasing.
Who Else Is Building Here — Competition Landscape
Pious Orchards shares Sports City sub-plot SC-02/J&K with Pious Hideaways, while Sector 150 has several other premium residential developments competing for buyers. These include ATS Kingston Heath, which we have covered separately in our ATS Kingston Heath review.
Buyers comparing projects in this locality should look beyond the quoted price per square foot. Apartment carpet area, construction progress, approval status, declared possession dates, actual completion and available amenities all deserve consideration. A lower quoted price does not necessarily represent better value if the project carries greater construction or regulatory uncertainty.
🏢 MyReviewHub Take — Compare Before You Commit: A completed or more advanced project may offer greater certainty regarding possession and immediate usability. Pious Orchards may appeal to buyers looking for its 3 BHK and 4 BHK configurations, with carpet areas of 132.85 sq. m and 189.52 sq. m respectively, and whose structures have reached full height. However, finishing work, common facilities and project-specific regulatory conditions still need to be considered before comparing it with alternatives.
What Could Make This Area More Valuable
Improvements to the Yamuna Pushta Road corridor could provide an alternative route and ease pressure on the Noida–Greater Noida Expressway, if the proposed works are completed. The approved Aqua Line extension from Sector 142 to Botanical Garden could also improve metro connectivity for Sector 150 once operational.
For Pious Orchards, clarity on the Sports City position for sub-plot SC-02/J&K would be another important development. Resolution of the outstanding project-specific conditions could reduce regulatory uncertainty for buyers and future purchasers.
However, these remain potential future benefits. Buyers should assess Pious Orchards on the infrastructure and approvals available today rather than assume that proposed improvements or regulatory clarity will materialise within a particular timeframe.
📍 MyReviewHub Take — Buy What Exists Today: Treat planned infrastructure improvements and the resolution of Sports City-related conditions as potential future upside, not as a reason to pay today for connectivity, facilities or approvals that are not yet available or confirmed.
MyReviewHub Location Factors
| Factor | Assessment | Status |
| Expressway connectivity | Good access to the Noida–Greater Noida Expressway, with the approved site plan showing the plot alongside a 45-metre Pushta Road. | ✅ Strong |
| Metro connectivity | Sector 148 provides the nearest operational Aqua Line access; residents need last-mile road transport. The approved extension is not yet operational. | 🟡 Reasonable, but car-dependent |
| Schools & healthcare | Several established schools and hospitals are accessible along the Expressway corridor, but generally require a drive. | 🟡 Good options, not at the doorstep |
| Shopping & daily needs | Routine conveniences are available in the wider locality; larger retail, dining and entertainment require travel. | 🟡 Still developing |
| Power infrastructure | A 33/11 kV PVVNL substation is listed for Sector 150, while Pious Orchards’ own receiving station was only 15% complete in September 2026. | 🟡 Project infrastructure under development |
| Drainage & waterlogging | Residents have reported drainage, waterlogging and sanitation concerns across Sector 150; no project-specific defect was established in the material reviewed. | 🟡 Locality-level concern |
| Sports City status | Wider restrictions were reportedly lifted in 2026, but the project-specific position for SC-02/J&K and the Tower 7 floors 22–31 condition remains unverified. | 🟡 Verify |
| Property price trend | No suitable institutional price-trend data identified within the research period. | 🟡 Not assessed |
📍 MyReviewHub Location Summary: Sector 150 offers strong Expressway connectivity and access to schools and hospitals across the wider corridor. However, everyday infrastructure is still developing, and residents remain dependent on road transport for metro access, larger shopping trips and healthcare. For ATS Pious Orchards, the most significant location-related consideration is its position within the Sports City framework. The project-specific implications, particularly the condition affecting Tower 7, deserve closer scrutiny before buyers commit.
What We Liked
✅ Statutory Banking Arrangements Disclosed on Record
The UP-RERA project record identifies a collection account and a separate (70%) account for Pious Orchards with ICICI Bank, Sector 18, Noida. The quarterly CA certificates also report deposits into and withdrawals from the separate account, providing buyers with a documented record of the project’s statutory banking arrangements.
👍 MyReviewHub Take: Buyers can identify the bank and accounts disclosed in the UP-RERA records and follow the reported transactions through the quarterly CA certificates. This provides a useful level of documentary visibility into the project’s banking arrangements.
✅ ATS Pious Orchards Construction Update — Superstructure Complete in All Ten Towers
The September 2026 architect’s certificate records a significant construction milestone at ATS Pious Orchards: the superstructure slabs of all ten residential towers have reached 100% completion. This means the project’s major structural phase is complete, and construction has moved into the finishing and building-services stages.


The tower-wise progress figures below, taken from the same certificate, provide a snapshot of the work recorded across the residential towers.
| Tower | Configuration | Internal walls & flooring | Sanitary | Electrical | Stairs, lifts & lobbies | External plaster & waterproofing |
|---|---|---|---|---|---|---|
| T1 | 3 BHK | 96% | 64% | 73% | 89% | 88% |
| T2 | 3 BHK | 95% | 63% | 69% | 86% | 87% |
| T3 | 4 BHK | 97% | 61% | 60% | 74% | 82% |
| T4 | 4 BHK | 89% | 60% | 51% | 69% | 53% |
| T5 | 4 BHK | 89% | 60% | 61% | 42% | 30% |
| T6 | 4 BHK | 79% | 48% | 55% | 42% | 30% |
| T7 | 4 BHK | 42% | 23% | 15% | 11% | 19% |
| T8 | 3 BHK | 57% | 40% | 17% | 31% | 26% |
| T9 | 3 BHK | 95% | 63% | 54% | 81% | 83% |
| T10 | 3 BHK | 89% | 60% | 49% | 69% | 81% |
📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), Architect’s Certificate (Form REG-1), dated 6 October 2026, for the quarter ending 30 September 2026.
Open the UP-RERA portal →
Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and open the Quarterly Progress Report section.
MyReviewHub Take — A Significant Construction Milestone: Completion of the superstructures across all ten towers is a positive milestone for Pious Orchards. It marks the completion of one major stage of construction, allowing the remaining work to focus on internal finishing, building services and common facilities. MyReviewHub has not independently verified the progress percentages reported in the certificate.
✅ Registered Land Documents Are Available and Traceable
MyReviewHub reviewed the registered documents filed on UP-RERA that set out the land chain:
- Noida Authority → Lotus Greens Constructions Pvt. Ltd.: lease deed registered as document no. 7360 in November 2015 (as recorded in the later deeds; the lease deed itself is not among the UP-RERA filings). Noida Authority’s letter of 6 June 2016 then permitted Lotus Greens to develop through 12 subsidiaries, listing SC-02/J&K (72,000 sq. m) against Fest Homes Developers.

- Lotus Greens → Fest Homes Developers Pvt. Ltd.: Sub-lease deed dated 15 June 2016 (Document No. 6344) covering the 72,000 sq. m sub-plot SC-02/J&K.

- Fest Homes → Homekraft Infra Pvt. Ltd.: Development agreement dated and registered 22 December 2018 (Document No. 9246), describing Homekraft Infra as “promoted by the promoter of ATS Group”.


MyReviewHub Take: The availability of a documented and traceable land-document chain is a positive. However, reviewing these documents is not a legal opinion on title. Buyers should have an independent property lawyer examine the current title, applicable rights and encumbrance position before committing.
✅ Detailed Unit Inventory on UP-RERA
The UP-RERA project record provides tower-wise residential inventory details, including apartment configurations, registered carpet areas and floor-wise unit counts. Based on our count of these entries, the project has 608 apartments across ten residential towers and nine shops in the commercial building. The breakdown is presented below.
| Unit Type | Registered Carpet Area | Flats | Towers |
|---|---|---|---|
| 3 BHK | 132.85 sq. m | 304 | 1, 2, 8, 9, 10 |
| 4 BHK | 189.52 sq. m; 190.45 sq. m on first floor | 304 | 3, 4, 5, 6, 7 |
| Shops | 16.72 sq. m (8); 27.41 sq. m (1) | 9 | Commercial building |
Two details are worth noting:
- Registered configurations: The UP-RERA inventory lists 3 BHK and 4 BHK residential apartments. Buyers should use this registered inventory when checking unit configurations rather than relying solely on third-party property listings.
- Floor numbering: The tower-wise inventory records the 13th-floor entry as “Other”, with zero units. This is how the floor is classified in the portal; it should not be taken as evidence that a physical floor is absent.
📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), tower-wise unit inventory.
How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and open Details of Apartment/Flat/Shop/Plot.
What Concerned Us
🟡 1. Tower 7, Floors 22–31 Are Tied to Completion of the Sports City
Condition 19 of Noida Authority’s building sanction for SC-02/J&K (letter dated 30 January 2019) allows 4,306.392 sq. m of unused Sports City recreational floor area to be used for housing only after all works and facilities of the recreational component are completed and an occupancy certificate is obtained. Until then, the sanction states, approval for that part is only symbolic (our translation of “मात्र प्रतीकात्मक”). The approved site plan identifies where that floor area sits: “22nd to 31st floor of Block G – Tower 7 with FAR of 4306.392 sqm will be developed after completion of Sports city as per condition of Sanction letter.”
UP-RERA’s registered inventory lists 20 four-bedroom flats on those ten floors, with no separate marking. The architect’s certificates record Tower 7’s superstructure at 0% (December 2023), 10% (December 2024), 40% (December 2025), 40% (June 2026) and 100% (all 30 slabs) for the quarter ending September 2026. We did not find, in the records reviewed, any Noida Authority approval releasing this condition, and we could not confirm whether the 2026 revised SC-02 layout changes it.


📄 Source: UP-RERA, Pious Orchards (UPRERAPRJ183246): Plan Details (“Uploaded Sanctioned Letter”, letter NOIDA/MVN/2019/IV-1513/1091, and “Uploaded Approve Layout”, site plan SD-01); tower-wise unit details; QPR architect certificates, Tower 7.
Open the UP-RERA portal →
How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and open Plan Details, the tower-wise unit details and the Quarterly Progress Report section.
Why This Matters: If you are considering an apartment on floors 22–31 of Tower 7, seek written clarification from the promoter on the status of the Noida Authority condition and whether it has been formally fulfilled, modified or released. Ask for the relevant Authority approval and have the position reviewed by an independent property lawyer before committing to the purchase. The unresolved condition could have implications for approval and occupancy of the affected floors.
🟡 2. UP-RERA Shows No Revalidated Building Permit After January 2024
The Noida Authority sanction letter states that the building plan is valid for a maximum period of five years from the date of approval. UP-RERA’s Plan Details record the original building permit, dated 30 January 2019 (Permit No. NOIDA/MVN/2019/IV-1513/1091), as valid up to 29 January 2024.
The same portal record shows the revalidated permit number, date and validity fields as blank. It also lists 29 January 2029 as the date up to which the permit is extendable. However, this does not establish that an extension or revalidation was actually granted.
The quarterly progress reports record construction activity continuing after January 2024. A revalidation may exist but not be reflected in the public portal record. The promoter’s Form-B upload is titled “Affidavit for Map Ravalidation”; however, when we attempted to open it in October 2026, the document displayed as a blank page. We could therefore not verify its contents or establish whether the building permit was revalidated.

📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), View Project Detail → Plan Details.
Open the UP-RERA portal →
How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and open Plan Details.
Why This Matters: A valid building-plan approval is an important part of a project’s regulatory compliance. Blank fields on UP-RERA do not establish that the permit was not renewed; they indicate that the revalidation is not shown in the public record we reviewed. Ask the promoter for Noida Authority’s revalidation or extension letter and independently confirm that it remains valid and covers the construction being carried out, including the remaining work through project completion.
🟡 3. Common Facilities Are Well Behind the Towers
The September 2026 architect’s certificate records significantly lower progress on several shared facilities compared with the completed superstructures of the ten residential towers. The community building (clubhouse) is recorded at 0%, the sewage treatment plant (STP) at 20%, internal roads and footpaths at 28%, landscaping at 20%, and fire protection at 40%.
Finishing progress is also uneven across the residential towers. Tower 7 records the lowest progress among all ten towers across every finishing category listed in the architect’s certificate, including internal walls and flooring, sanitary installations, electrical works, stairs, lifts and lobbies, and external plaster and waterproofing.
The project’s declared completion date is 30 September 2028. The September 2026 certificate therefore provides an important snapshot of the work remaining on common facilities and tower finishing.

📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), Quarterly Progress Report (QPR) for 1 July 2026 to 30 September 2026, Architect’s Certificate, Table B — Common Development Work.
Open the UP-RERA portal →
How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and open the Quarterly Progress Report section.
Why This Matters: Before accepting possession, check that the STP, fire-protection systems, lifts and access roads serving your tower are complete and operational. Also inspect the clubhouse and landscaping rather than assessing readiness based only on the progress of your individual flat.
🟡 4. What the September 2026 CA Certificate Shows About Collections, Costs and the Separate Account
The September 2026 CA certificate records ₹935.72 crore received from allottees since the project began, against a total estimated project cost of ₹829.12 crore. The estimated cost has increased from the ₹728.04 crore declared on UP-RERA at registration.
The certificate also records ₹688.87 crore as the amount incurred, cumulative withdrawals of ₹654.98 crore from the separate account and a closing balance of ₹2.38 lakh. It reports no project loan. However, its mortgage note prints both alternatives — that the land “has not been mortgaged” and that it “has been mortgaged in other project(s)” — without indicating which applies.


📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), Quarterly Progress Report for 1 July–30 September 2026, CA Certificate dated 9 October 2026.
Open the UP-RERA portal →
Search for UPRERAPRJ183246 and open “View Project in Detail” to locate the September 2026 CA certificate. The detailed page does not open reliably from a shared link.
How to Read These Figures
“Received from allottees” represents the total amount buyers have paid towards their units, while “total estimated project cost” is the promoter’s estimate of the cost of completing the project. These are different measures, so collections exceeding the estimated cost do not, by themselves, indicate a financial problem.
Under RERA, 70% of collections are required to be deposited into the project’s separate account. Withdrawals from this account are permitted in proportion to the percentage of project completion, supported by the required professional certifications.
The September 2026 certificate records ₹655.00 crore as the 70% share of collections to be credited to the separate account. It records cumulative withdrawals of ₹654.98 crore and a closing balance of ₹2.38 lakh. The certificate also calculates permitted cumulative withdrawals of ₹688.83 crore, meaning the reported withdrawals are below that calculated limit.
The certificate provides summary figures rather than a transaction-wise account of deposits and withdrawals. MyReviewHub has not examined the separate-account bank statements.
Why This Matters: These figures come from the promoter’s CA-certified filings, not an independent audit by MyReviewHub, and do not by themselves establish financial distress or misuse of funds. Buyers following a construction-linked payment plan should request the latest CA certificate before making major payments and ask the promoter to clarify which of the two mortgage statements in the certificate applies to the project, along with supporting documentation.
🟡 5. Commencement Certificate, Form-B and Fire NOC Could Not Be Verified
The file listed on UP-RERA as the “Commencement Certificate” (Pious_EC_Letter_opt.pdf) is actually an Environmental Clearance issued by SEIAA Uttar Pradesh on 16 May 2019. It was issued to Fest Homes Developers for “ATS Home Kraft Pious Hideaways” and covers the wider 72,000 sq. m Sports City plot, rather than serving as the project’s commencement certificate.

PRJ78293347Pious_EC_Letter_opt.pdf under “Commencement Certificate” (uploaded 12 August 2021). The “Other Plan” entry identifies a reply to the objection letter dated 27 September 2021, a fire NOC and related affidavits.
The Form-B affidavit and the “Other Plan” upload could not be verified because both opened as blank pages when we attempted to view them in October 2026. The portal describes the “Other Plan” upload as including the fire NOC and a reply to a UP-RERA objection letter dated 27 September 2021.
The occupancy-certificate proforma is marked “Promoter select NA for this document”.
📄 Source: UP-RERA — Pious Orchards (UPRERAPRJ183246), Documents Uploaded (items 1, 3 and 4).
How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail and scroll to Documents Uploaded.
Why This Matters: The public record reviewed does not establish that any approval is missing. However, buyers cannot independently verify the status of these approvals from the available portal uploads. Ask the promoter for the project’s commencement certificate, fire NOC and relevant Form-B affidavit, and have their validity and applicability confirmed before committing to the purchase.
🟡 6. Proforma Documents Show a Three-Party Sub-Lease, with Resale Subject to Noida’s Consent
The promoter’s proforma documents uploaded to UP-RERA at registration contain several terms that buyers should examine carefully. These are draft documents, not proof of the terms that will appear in the final executed agreement and deed. The executed documents and applicable law will govern the purchase.
The proforma conveyance deed is titled “Sale Deed for Superstructure of Residential Unit and Sub-Lease Deed for Land”. It describes a tripartite arrangement involving Noida Authority as the lessor, Fest Homes Developers as the sub-lessee (according to the deed’s recitals), and the buyer as the “sub-sub-lessee”. Homekraft Infra is named as the “Assignee”. The draft also states that it is “subject to final approval of NOIDA at the time of execution”.
Under this draft, the buyer cannot sell, transfer, mortgage or sub-let the property without the lessor’s prior written consent. It also states that common facilities, including the club, parking, roads and parks, “shall remain the property of the Sub-Lessee”. Unpaid dues — including maintenance, electricity and power back-up charges billed through the prepaid meter — carry interest at 18% per annum for the period of delay.

The separate proforma application form contains additional booking conditions. It states that a confirmed booking cannot be withdrawn “for any reason whatsoever” and that, in cases of non-compliance, the booking amount may be forfeited along with interest due or payable and brokerage paid.

How to access: Scroll down the main homepage of the official UP-RERA website to the SEARCH panel on the left and click REGISTERED PROJECTS. Enter UPRERAPRJ183246 in the RERA Reg. No. box, click the blue eye icon under Details, then click View Project in Detail and scroll to Documents Uploaded.
Why This Matters: These draft terms could affect a buyer’s ability to resell, mortgage or let out the property, as well as the treatment of common facilities and the financial consequences of booking cancellation or non-compliance. Before signing or making payments under binding terms, have an independent property lawyer review the final agreement, conveyance deed and sub-lease provisions. Ask specifically about the Noida Authority consent requirement, rights over common areas, maintenance interest and cancellation or forfeiture conditions, and have the applicable legal position checked against the relevant RERA and apartment-ownership provisions.
🟡 7. Wider Sports City Restrictions Were Lifted, but SC-02/J&K’s Project-Specific Position Remains Unclear
Sports City-wide context: The developments described below concern the wider Sports City scheme and SC-02. They should not be treated as confirmation that every approval or condition relating to Pious Orchards has been resolved.
Noida Authority put Sports City approvals on hold in 2021, as reported by Hindustan Times. The CAG’s Performance Audit of Land Acquisition and Allotment in NOIDA (Report No. 6 of 2021) recorded that the SC-02 layout, approved on 17 January 2017, “was approved without payment of up-to-date dues” (para 5.2.16.3). It also recorded that sports facilities on SC-02 were due by December 2019 and that, as of January 2021, “the scheduled time of completion of sports facilities has lapsed” (para 5.2.17.1). These are historical audit findings and do not establish the present dues position or current compliance status.
In April 2026, ET Realty reported that Noida Authority had lifted the ban on four Sports City projects, ending a freeze that had blocked map approvals, building-plan revalidations and occupancy certificates, and that developers must now submit revised layouts for approval. Hindustan Times reported that the board had accepted the resolution plan for the SC-02 plot. These reports concern the Sports City scheme and the wider SC-02 plot. They do not identify a project-specific clearance for Pious Orchards on sub-plot SC-02/J&K, and they do not establish that the condition affecting Tower 7 floors 22–31 has been fulfilled, modified or released.

There is also a financial aspect to the land arrangement. The registered sub-lease deed records that ₹111.744 crore of the original land premium was to be paid directly by the Sub-Lessee to Noida Authority. It also records that Noida Authority holds the first charge on the plot for its dues. We could not independently verify the current dues position or establish whether the relevant project-specific approvals and conditions for SC-02/J&K have been formally addressed.

Why This Matters: The reported lifting of wider Sports City restrictions should not be interpreted as confirmation that Pious Orchards has received every project-specific approval or that the Tower 7 floors 22–31 condition discussed in Concern 1 has been resolved. Buyers should request Noida Authority’s latest written position on SC-02/J&K, including any revised layout approval, current land-premium dues and any outstanding conditions affecting Tower 7, occupancy certificates or property registries. These documents should be reviewed independently before committing to a purchase.
Builder Track Record
Homekraft Infra Private Limited (incorporated in 2017; CIN: U70200DL2017PTC314287) is the legal promoter of Pious Orchards, marketed under the ATS Homekraft name.
The land is held on sub-lease by Fest Homes Developers Private Limited. Noida Authority’s letter dated 6 June 2016 and the sub-lease deed dated 15 June 2016 record Lotus Greens Constructions Private Limited as holding 100% of Fest Homes’ shares at that time. We have not verified whether this ownership relationship continues today.
A registered Development Agreement dated 22 December 2018 gives Homekraft Infra the development rights and describes it as “promoted by the promoter of ATS Group”. That is the wording of the deed; it does not establish a corporate ownership relationship between them. We have not independently examined the companies’ current MCA21 filings or their UP-RERA complaint records.
MyReviewHub View: The reference to ATS is group context from a 2018 deed, not a substitute for assessing Pious Orchards on its own construction progress, approvals, financial disclosures and project-specific conditions. Buyers should also understand the separate roles of Homekraft Infra as promoter and Fest Homes as land sub-lessee before committing to a purchase.
Buyer Considerations
This Project May Work for You If:
- You want a spacious 3 BHK or 4 BHK in Sector 150 and are comfortable with the declared completion date of September 2028.
- You prefer a project where all ten residential towers have completed their structural slabs, while understanding that finishing and common facilities are still under construction.
- You are considering a home outside Tower 7 floors 22–31, or have obtained written clarification from Noida Authority regarding those floors.
- You are prepared to have an independent property lawyer review the sub-lease arrangement, building-plan revalidation and final agreement before committing to the purchase.
This Project May Not Suit You If:
- You need a home ready for immediate possession or registry.
- You expect to be able to resell, transfer, mortgage or sublet without obtaining Noida Authority’s prior written consent.
- You want complete clarity on the project-specific status of Sports City approvals before buying.
- You expect the clubhouse and shared facilities to be close to completion at this stage.
- You prefer a straightforward purchase that requires minimal legal and document verification.
ATS Pious Orchards Review — Our Assessment
ATS Pious Orchards has made strong structural progress, with all ten towers reaching 100% slab completion by September 2026, ahead of the declared September 2028 completion date. The key considerations for buyers are the unresolved Sports City condition affecting Tower 7 floors 22–31, building-plan revalidation not reflected in the UP-RERA records reviewed, common facilities still under development, and the sub-lease restrictions on property transfers.
Before You Commit
Check the latest UP-RERA record for UPRERAPRJ183246 and obtain Noida Authority’s written clarification on the Tower 7 floors 22–31 condition. Request the revalidated building permit, commencement certificate and applicable fire approval from the promoter, and verify their status with the relevant authorities. Have an independent property lawyer examine the sub-lease, current land-charge status, transfer restrictions and final agreement for your specific unit before making further payments.
UP-RERA Verification — Check the Records Yourself
| Field | Value |
|---|---|
| RERA Registration Number | UPRERAPRJ183246 |
| Registration Date | 8 October 2021 |
| Legal Promoter | Homekraft Infra Private Limited |
| Declared Completion Date | 30 September 2028 |
| Building Permit | NOIDA/MVN/2019/IV-1513/1091, dated 30 January 2019; originally valid up to 29 January 2024. Revalidation fields are blank in the records reviewed. |
| Latest QPR Reviewed (Q20) | 75.01% construction and development / 83.08% total project, for the quarter ending 30 September 2026 |
| Occupancy / Completion Certificate | Promoter marked the proforma field “NA”; current OC/CC status could not be independently verified. |
Verify Yourself: Visit the official UP-RERA website. Scroll down to the SEARCH panel on the left, select REGISTERED PROJECTS, and enter UPRERAPRJ183246 in the RERA Reg.No. box, click the blue eye icon under Details, then click View Project in Detail. Check the project details, Plan Details, latest Quarterly Progress Reports and Documents Uploaded. Pay particular attention to building-plan revalidation, the Tower 7 floors 22–31 condition and approvals applicable to your specific tower and unit.
🔍 MyReviewHub Research Methodology: Every MyReviewHub review is built primarily on official government records, including UP-RERA filings, registration documents, regulatory records and other publicly available statutory documents. Where appropriate, we supplement this research with clearly identified secondary sources.
Share Your Experience
Have you bought, visited or booked in ATS Pious Orchards, Sector 150, Noida? Your honest experience — good or bad — helps other buyers make better decisions. Leave your review below.
There are no reviews yet. Be the first one to write one.
🔗 Sources & References
This ATS Pious Orchards Review is based on UP-RERA filings, government records, registered documents, media reports and other publicly available information reviewed by MyReviewHub.
Government & Regulatory
- UP-RERA Project Registration Record — Pious Orchards, Registration No. UPRERAPRJ183246.
- UP-RERA Quarterly Progress Reports — Architect’s Certificates for quarters ending December 2022, December 2023, December 2024, December 2025, June 2026 and September 2026; CA Certificates for June and September 2026; Engineer’s Certificate for September 2026.
- Noida Authority building-plan sanction — NOIDA/MVN/2019/IV-1513/1091, dated 30 January 2019, with approved site plan SD-01.
- Noida Authority letter Noida/Commercial/2016/471, dated 6 June 2016.
- Registered Sub-Lease Deed — Lotus Greens Constructions Pvt Ltd to Fest Homes Developers Pvt Ltd, dated 15 June 2016 (Document No. 6344).
- Registered Development Agreement — Fest Homes Developers Pvt Ltd and Homekraft Infra Pvt Ltd, dated 22 December 2018 (Document No. 9246).
- Environmental Clearance — SEIAA Uttar Pradesh, dated 16 May 2019.
- Encumbrance Report filed with UP-RERA, dated 10 August 2021.
- Proforma Conveyance Deed, Application Form and Allotment Letter filed with UP-RERA.
- PVVNL — Gautam Buddha Nagar Office Geography, 33/11 kV Substation List. https://pvvnl.org/office_geographic/Gautam%20Buddha%20Nagar
- Comptroller and Auditor General of India — “Performance Audit Report of the C&AG of India on Land Acquisition and Allotment of Properties,” Government of Uttar Pradesh, Report No. 6 of 2021; Chapter V (5.2), Allotment of Sports City, paragraphs 5.2.16.3 and 5.2.17.1. https://cag.gov.in/uploads/download_audit_report/2021/13.%20Chapter-5.2%20Allotment%20of%20Sports%20City-061bc9124974547.17763101.pdf
News Reports
- Hindustan Times — “Noida set to spend ₹30-cr to repair 11.5km Pushta Road,” Vinod Rajput, 27 February 2026. https://www.hindustantimes.com/cities/noida-news/noida-set-to-spend-30-cr-to-repair-11-5km-pushta-road-101772140640376.html
- ET Infra — “Noida set to repair Pushta Road to ease e-way gridlock,” TNN, 27 February 2026. https://infra.economictimes.indiatimes.com/news/roads-highways/noida-set-to-repair-pushta-road-to-ease-eway-gridlock/128841394
- The Times of India — “Dotted with condos, but Sector 150 pockmarked with broken roads, potholes, garbage heaps,” Meenakshi Sinha, 16 August 2026. https://timesofindia.indiatimes.com/city/noida/dotted-with-condos-but-sector-150-pockmarked-with-broken-roads-potholes-garbage-heaps/articleshow/133280936.cms
- Hindustan Times — “Consortium of realtors working on plan for Sports City projects,” Vinod Rajput, 8 April 2026. https://www.hindustantimes.com/cities/noida-news/consortium-of-realtors-working-on-plan-for-sports-city-projects-101775587795273-amp.html
- ET Realty — “Revival path to open for all Sports Cities if developers in Noida submit plans,” Shafaque Alam / TNN, 8 April 2026. https://realty.economictimes.indiatimes.com/news/industry/noida-sports-cities-revival-developers-can-now-submit-plans-for-clearance/130100006
- Press Information Bureau, Ministry of Housing and Urban Affairs — “Cabinet approves extension corridor from Noida Sector 142 to Botanical Garden (Noida) for a length of 11.56 Km with 8 stations,” 14 February 2026. https://www.pib.gov.in/PressReleasePage.aspx?PRID=2227989&lang=1®=46
⚠️ Disclaimer
This review is based on publicly available information, including official UP-RERA filings, registered documents, government records and published news reports. MyReviewHub has not received any payment from Homekraft Infra Private Limited, Fest Homes Developers Private Limited, the ATS group, or any associated entity for this review. This is an independent editorial review.
Information is accurate to the best of our knowledge as of the dates of the official records cited, but project and regulatory status can change. Buyers should independently verify the latest construction progress, possession timeline, OC/CC status and other applicable approvals directly with UP-RERA, Noida Authority and the promoter before making any purchase decision.
This review does not constitute legal or financial advice. For legal questions, property-document verification, RERA complaints or compensation claims, consult a qualified property lawyer or other appropriate professional.
Reviews and comments are personal opinions of their authors. MyReviewHub does not veri fy them and does not endorse them.
© MyReviewHub | India’s Most Honest Property Reviews | myreviewhub.com
Compare and Verify
Our review is based primarily on official records, and you can check them yourself. The button below opens the UP-RERA project summary page for ATS Pious Orchards (project registration no. UPRERAPRJ183246; promoter registration no. UPRERAPRM73892). From there, click VIEW PROJECT IN DETAIL to examine the quarterly progress reports, sanctioned plans and the “Documents Uploaded” section.
Open UP-RERA Record →Learn more about our Review Methodology