Godrej Meridien Sector 106 Review 2026 β€” Is This the Best Luxury Address on Dwarka Expressway?

⚑ MyReviewHub Quick Verdict
🟒 Phase 1 β€” REASONABLE BUY
🟑 Phase 2 & 3 β€” VERIFY BEFORE COMMITTING
⏱ Multiple Phase Delays βœ… Phase 1 Occupied
Phase 1 is completed and occupied, making it a more straightforward buying decision. Buyers considering Phase 2 or Phase 3 should independently verify current construction progress, possession timelines and on-ground conditions before committing.

This verdict is based on information available at the time of research. Always conduct your own due diligence before making any purchase decision. Featured image: Aerial view via Google Earth

This Godrej Meridien Sector 106 review is based entirely on official H-RERA documents, government filings, HARERA hearing proceedings, verified court orders, building plan approval records, resident reviews from MouthShut, Reddit, Housing.com and YouTube, news reports from Hindustan Times and Times of India, and CAQM inspection data β€” not builder brochures.

Project at a Glance

ParameterDetails
Project NameGodrej Meridien (Phase I, II & III)
Legal Entity (Promoter)Godrej Real View Developers Pvt. Ltd. (SPV)
Parent CompanyGodrej Properties Limited (NSE: GODREJPROP)
LocationVillage Babupur, Sector 106, Gurugram β€” Dwarka Expressway Belt
License No.18 of 2008 (originally granted to Rainbow Promoters, transferred to Godrej 2017)
Phase 1 RERA No.RC/REP/HARERA/GGM/273/2018/05 dated 18.05.2018
Phase II RERA No.RC/REP/HARERA/GGM/274/2018/06 dated 18.05.2018
Phase 3 RERA No.GGM/393/125/2020/09 dated 10.02.2020
Project TypeUltra-Luxury High-Rise Residential
Total Land Area14.793 Acres (all phases share same licensed land)
Towers / Height7 Towers Β· G+19 to G+34
Phase I8.61 Acres β€” 327 units (192 main + 135 EWS) + 11 commercial β€” OC obtained
Phase II1.113 Acres β€” 134 units (1 tower) β€” OC unconfirmed
Phase III5.06 Acres β€” 428 units (4 towers + nursery school) β€” Extended to 30.03.2027
Total Units889 residential units across all phases (2 BHK, 3 BHK, 4 BHK)
Escrow BankICICI Bank β€” separate accounts per phase
Launch Priceβ‚Ή9,000–9,500 per sq. ft.
Resale Asking Pricesβ‚Ή15,000–18,500 per sq. ft. β€” asking prices observed on Housing.com, May 2026. Verify current status independently
Sworn Possession β€” Phase I30 September 2020
OC Obtained β€” Phase I31 March 2023 βœ…
Physical Possession β€” Phase I27 November 2024
Verified Delay β€” Phase I4 years 2 months
Phase II OC StatusUnconfirmed ❌
Phase III Extended Deadline30 March 2027 ❌
H-RERA Penalty10.8% annual interest β€” December 2025 order

Location Analysis for Godrej Meridien Sector 106

Sector 106 sits in the Dwarka Expressway belt of Gurugram β€” one of Delhi NCR’s most consequential infrastructure investments of the past decade. The expressway, has opened a direct, signal-free corridor between Sheetla Mata Road and NH-48, transforming what was once a peripheral agricultural belt into a high-density development zone. For a project priced at the luxury end of this market, the address has genuine weight. The question this review addresses is whether the infrastructure underneath that address can support the lifestyle being sold.

Google Earth satellite view of Godrej Meridien Sector 106 showing surrounding roads, drainage corridor and nearby development parcels.
Satellite view of Godrej Meridien and its immediate surroundings, including adjoining roads, drainage corridor and nearby land parcels. Source: Google Earth.

Road Connectivity

The project offers direct connectivity to Dwarka Expressway, which links seamlessly to NH-48 (Delhi-Gurgaon Expressway). In practical terms for daily commuters: IGI Airport is approximately 15 km away β€” around 20 minutes in light traffic. Cyber City and Udyog Vihar are 14 km. Gurgaon Railway Station is barely 4 km via Daulatabad Main Road. These are genuine positives for working professionals.

MyReviewHub uncovered a critical road connectivity issue directly from official HARERA hearing records β€” not from buyer complaints. During the Phase 3 registration hearing on 10 February 2020, HARERA recorded: the proposed 24-metre wide road providing main access to the project was not constructed. Temporary access was being provided via an 18-metre wide culvert. More significantly, HARERA noted that this 24-metre road runs through both Godrej’s land and the land of adjoining developers β€” meaning Godrej cannot build it unilaterally without coordination with neighbouring projects.

HARERA approved Phase 3 registration only after directing Godrej to file an affidavit committing to complete this road before handing possession to buyers. That affidavit was submitted in November 2019. As of May 2026 β€” six years later β€” the permanent 24-metre road situation remains unresolved, consistent with what multiple Phase 1 residents have reported on public forums.

Godrej Meridien Sector 106 Location Map – Dwarka Expressway Connectivity
Location map showing Godrej Meridien’s position in Sector 106, Gurugram, with connectivity towards Dwarka Expressway and major city destinations. Source: Google Maps.

Additionally, the Building Plan Approval document issued by the Directorate of Town & Country Planning contains an explicit condition: “The revenue Rasta if any passing through the site shall be kept unobstructed.” This officially confirms the presence of a Revenue Raasta β€” a government road β€” within the project boundary, which must remain accessible to the public. Buyers expecting a fully sealed, private gated community should factor this in.

Sector 106 offers the following travel distances under normal traffic conditions:

  • Cyber City / Udyog Vihar β€” approximately 15 minutes by car
  • IGI Airport β€” approximately 20–25 minutes via Dwarka Expressway
  • NH-48 β€” accessible via Hero Honda Chowk
  • Central Delhi (Connaught Place) β€” 40–50 minutes

⚠️  MyReviewHub Note β€” Paper vs. Ground Reality The expressway connectivity is real and operational. What the brochure does not show is the Bajghera underpass β€” a critical arterial connector on the Dwarka Expressway service road β€” which floods and shuts down completely during every heavy monsoon rain event. Residents and the RWA president have flagged this as a “design flaw” that adds 15–30 minutes to commutes on every heavy rain day. We document the full drainage situation in the concerns section.

Metro Connectivity

The Union Cabinet approved the Gurugram Metro Rail Project which includes a planned corridor along Dwarka Expressway. This would significantly improve connectivity for daily commuters and boost property values in this micro-market. However, as of mid-2026, this metro stretch is not yet operational. The nearest functional metro station remains IFFCO Chowk – 8.08 km or Huda City Centre β€” approximately 15–20 minutes by road.

Buyers should treat metro connectivity as a future benefit with genuine long-term upside β€” but not a present reality that justifies a premium today.

Brokers routinely reference “metro connectivity” as a selling point for this corridor. Here is the verified data for Sector 106 specifically.

  • Nearest bus stop β€” 770 metres
  • Nearest operational metro β€” IFFCO Chowk β€” 8.08 km
  • Proposed Sector 101 station under Gurugram Metro β€” 4–6 km away, expected 2029
  • Direct metro to Sector 106 β€” Not planned

The Gurugram Metro project began construction in May 2025 with a projected 2029 completion. Even upon completion, no station is planned inside or adjacent to Sector 106. For the foreseeable future, all daily commuting from this address requires private vehicle ownership. Metro connectivity is a long-term future possibility β€” not a present-day reality.

Schools Nearby

The educational ecosystem within 5 km is a genuine strength of this location of Godrej Meridien Sector 106 β€” one of the few in this review that carries no meaningful caveat:

  • Delhi Public School (DPS)
  • GD Goenka World School
  • GEMS International School
  • Euro International School
  • Royal Oak International School
  • Blue Bells School

Over 10 reputed schools are accessible within a short drive. One important qualifier: the Sector 106/109 dividing road β€” the primary access route β€” floods after every heavy rain, disrupting school commutes seasonally. Children also face the 24-metre public road crossing to reach certain project amenities, which we document separately.

Hospitals and Healthcare

  • Fortis Hospital β€” Sector 62B (within 5 km)
  • Artemis Hospital β€” accessible via Dwarka Expressway
  • Columbia Asia β€” nearby
  • Global Hospital β€” within radius

For critical emergencies, Medanta β€” The Medicity in Sector 38 remains the nearest tertiary-care facility, approximately 35–50 minutes by road in peak traffic. For families with elderly members or young children, this travel time during emergencies is a genuine consideration.

MyReviewHub assessment: Healthcare access is adequate for routine needs. For critical emergencies requiring top-tier care, the travel time to Medanta in real traffic conditions is a limitation that families should weigh when making their final decision.

Shopping and Daily Life

Daily essentials are covered well β€” local markets, pharmacies, and grocery delivery services work efficiently in this part of Gurgaon. The nearest organized retail destination is Global Foyer Mall on Golf Course Road. Ambience Mall and other major malls in central Gurgaon are 25–30 minutes by road. The surrounding area is still developing β€” which means shopping and entertainment convenience will improve meaningfully over the next 3–5 years, but is not fully mature today.

For residents who prefer walkable access to organized retail and dining, Sector 106 in its current state requires travel. For those comfortable with delivery services and weekend drives to malls, the daily life picture is workable. be a consideration.

Property Price Trends β€” The Investment Case

If we talk of the investment opportunities and the emerging proce trends, sector 106 genuinely impresses. Property prices in Dharampur, Sector 106 increased by 203.2% over the period 2016 to 2025 β€” among the strongest appreciation corridors in Gurgaon. For long-term investors who entered this micro-market early, the returns have been real and substantial.

Current resale pricing at Godrej Meridien sits between β‚Ή14,000 and β‚Ή18,000 per sq.ft. β€” and average asking prices have been showing modest but consistent quarterly increases. Rental yields are also meaningful: 2–4 BHK units are commanding β‚Ή39,500 to β‚Ή75,000 per month, which represents a healthy yield for a luxury product.

Who Else Is Building Here β€” Competition Landscape

Godrej Meridien is not the only option in Sector 106 and the immediate Dwarka Expressway stretch. Sobha Altus, Elan The Presidential, Hero Homes, MRG Crown, and ATS Sanctuary are among the competing projects in the same corridor. Some of these competitors offer ready-to-move inventory β€” an important consideration for buyers who cannot wait for Phase 2 or Phase 3 timelines. Buyers considering Godrej Meridien should compare not just price per sq.ft. but also delivery status, OC availability, and actual access road conditions across competing projects before committing.

What Could Make This Area More Valuable

The future of Sector 106 is genuinely bright. The Dwarka Expressway is now fully operational, the metro corridor is approved and planned, IGI Airport proximity is a durable advantage, and the area is seeing continuous residential and commercial development. The Global City project β€” a planned 1,000-acre integrated township in the broader corridor β€” could be a significant long-term value driver if it develops as planned.

Sector 106 is well-positioned as a gateway between Delhi and the newer parts of Gurgaon. Early buyers in this corridor have already seen the appreciation numbers. The question for today’s buyer is whether the remaining upside justifies the ground-level risks specific to this project.

MyReviewHub Location Verdict

FactorAssessmentRating
Road connectivity (paper)Excellent β€” Dwarka Expressway, NH-48 operationalβœ… Strong
Road connectivity β€” monsoon realitySevere β€” Bajghera underpass floods; Sec 106/109 road waterlogged every heavy rainπŸ”΄ Critical concern
Metro connectivity8 km to nearest station; proposed 2029 station still 4–6 km away🟑 Wait and watch
SchoolsOutstanding β€” 10+ reputed schools within 5 kmβœ… Strong
HospitalsGood β€” Fortis, Artemis within 5 km; Medanta 35–50 min in peak trafficβœ… Good
Price appreciation203% in Sector 106 over 2016–2025βœ… Strong
Future potentialHigh β€” metro, expressway, Global City, airport. Promosing, if drainage resolved and metro materialises as plannedβœ… Strong
Air qualityDegraded β€” Metro construction + 5 towers under construction + proposed C&D plantπŸ”΄ Critical concern

πŸ“  Bottom Line on Location The corridor is real. Schools, hospitals, and expressway access are genuine positives. The problem is that Sector 106’s civic infrastructure β€” specifically the complete absence of a master stormwater drain network in sectors 81–110 β€” creates a recurring, seasonal crisis that no single developer can resolve, and that directly affects property value, daily life, and resale liquidity at this address.

What We Liked

βœ… Phase 1 Delivered with Government-Issued OC β€” Verified

MyReviewHub verified directly from HARERA records that the Occupation Certificate for Phase 1 was granted on 31 March 2023 by the Director General, Town & Country Planning, Haryana. The OC covers Towers 1 and 2 β€” 327 residential units (192 main and 135 EWS) and 11 commercial units. A government-issued OC is not a formality β€” it is the legal document confirming the buildings are structurally safe and fit for occupation. For buyers considering resale in Phase 1, this is the strongest possible positive signal.

βœ… Internal Amenities β€” Among the Best on the Expressway:

To be accurate and fair: the internal specification of Godrej Meridien is genuinely impressive for its segment. What was promised on paper has, for the two delivered towers, largely been delivered on the ground.

  • 5-Star “Elle Clubhouse” β€” triple-height designer lobbies, valet, doorman, concierge 24/7
  • Olympic-size swimming pool β€” plus dedicated kids’ pools
  • 2 Hectares of central greens β€” fragrance garden, herb garden, landscape walks
  • 4+1 high-speed elevators per tower β€” industry-appropriate for G+34; minimal wait times at current occupancy
  • 4-tier security + 360Β° CCTV β€” access control, closed parking, 24Γ—7 guards
  • International-grade fitness studio, EV charging, valet parking

Residents who have moved in consistently praise the internal product. Internal security, in particular, has received specific positive mentions β€” zero documented safety breaches or security incidents inside the delivered perimeter.

βœ… Institutional Developer β€” Not an Unlisted Builder:

The parent company, Godrej Properties Ltd., is listed on NSE (GODREJPROP) and backed by institutional investors. In FY2025, it achieved record bookings of β‚Ή29,444 crore β€” growing 31% year on year β€” and was ranked #1 globally in the Real Estate sector on the S&P Dow Jones Sustainability Index. A listed developer with institutional investors cannot simply walk away from obligations the way an unlisted single-project SPV can. That assurance, while not unconditional, is a meaningful positive for buyers.

βœ… Outstanding School and Healthcare Proximity:

Ten or more reputed schools within a short drive, including DPS and GD Goenka, and five multi-speciality hospitals within 5 km, including Fortis and Artemis. For families placing a priority on educational and healthcare proximity, the location genuinely delivers on this dimension.

βœ… H-RERA Buyer Protection β€” Active, Precedent-Setting, and Enforceable:

In December 2025, H-RERA Member Ashok Sangwan ruled in favour of delayed buyers Malik Ram and Sarita Verma against Godrej Real View Developers Pvt. Ltd. (Complaint No. 5869/2024), ordering a 10.8% annual interest penalty on the total amount paid β€” calculated from the revised deadline of March 30, 2023, to actual possession on November 27, 2024.

For a β‚Ή1.74 crore payment over approximately 20 months of delay, the single-buyer payout was approximately β‚Ή31–33 lakh. Critically, H-RERA rejected the developer’s Force Majeure defence β€” including COVID-19 extensions beyond the initial 6 months granted, and seasonal NGT pollution bans, which the authority specifically ruled are predictable events and not valid grounds for relief.

βœ… GRIHA Green Rating β€” Earned Additional FAR (From Building Plan Approval):

The Building Plan Approval document (Form BR-III) confirms that Godrej earned an additional 9% FAR on the basis of a 3-star provisional GRIHA (Green Rating for Integrated Habitat Assessment) rating. This is significant because it means the sustainability credentials are not merely marketing language β€” they are tied to the government’s construction approval. This also confirms the project’s low-density design has a legitimate regulatory basis.

βœ… Phase-Wise Escrow Accounts β€” Buyer Funds Separated per Phase:

Each of the three phases has its own dedicated ICICI Bank escrow account into which 70% of buyer receipts must be deposited by law:

  • Phase I: A/c 017705012034
  • Phase II: A/c 017705012041
  • Phase III: A/c 017705012038

This phase-wise separation is important β€” it protects buyers in one phase from financial issues in another. The promoter’s REP-II affidavit for Phase III confirms this commitment is sworn and legally binding.

βœ… All Major Statutory Approvals Were in Place Before Launch:

Form REP-I Part E for all three phases confirms that License Renewal, Zoning Plan, Building Plan Approval, Environmental Clearance, Airport Authority NOC, Fire Scheme Approval, Service Plan Estimate, and Forest NOC were all obtained before the project was launched. This stands in contrast to developers who launch projects with approvals still pending β€” a significant risk factor for buyers. Godrej had its compliance house in order at the time of launch.

βœ… Strong Long-Term Price Appreciation in Sector 106

Property prices in Sector 106 increased 203% between 2016 and 2025 β€” among the strongest appreciation corridors in Gurgaon. Buyers who entered early in this micro-market have seen real returns. The Dwarka Expressway, planned metro, and IGI Airport proximity continue to support long-term value arguments for patient buyers with a 5–7 year horizon.

What Concerned Us

πŸ”΄ 1. The Legal Entity Is an SPV β€” Not Godrej Properties

Before anything else: the entity you are contracting with is Godrej Real View Developers Private Limited β€” a Special Purpose Vehicle created specifically for this project β€” not Godrej Properties Limited, whose name and logo appear across all marketing.

  • Your legal counterparty is the SPV, not the parent brand.
  • In any dispute β€” over possession, refunds, defect liability, or compensation β€” your recourse is against Godrej Real View Developers Pvt. Ltd., not Godrej Properties’ balance sheet.
  • The SPV’s financial standing, its charges, and its relationship to the parent group should be independently verified before signing.

Importantly, in Form REP-I Part G for all three phases, the promoter entity stated under its HARERA filings: “Projects launched by the promoter in the last five years: No Projects.” This appears consistent with the fact that the project is being developed through a newly incorporated Special Purpose Vehicle (SPV), which does not have its own prior project delivery history.

πŸ”΄ 2. Phase I Was Delayed by Over Four Years β€” On Official Record

The Phase 3 promoter affidavit (REP-II), signed and notarised in November 2019, declared a project completion date of 30 September 2025, with an additional one-year grace period. Following the six-month COVID-related extension granted by HARERA, the revised deadline became 31 March 2026.

However, HARERA granted Extension No. 04 of 2026 on 12 February 2026, extending the completion timeline further to 30 March 2027.

For buyers who booked Phase 3 units in 2020 or 2021 based on the originally declared timelines, the expected completion date has moved significantly beyond the date stated in the original promoter affidavit.

Phase 2 also received extensions and, as of the date of this review, no Occupation Certificate could be independently verified by MyReviewHub. As a result, two of the project’s three phases have experienced completion timelines extending beyond the dates originally declared in the promoter filings.

Why this matters: Delivery timelines are one of the most important factors in residential real estate. Multiple deadline extensions may affect holding costs, rental planning, financing decisions, and overall buyer experience. Prospective buyers should review the latest HARERA filings and project status updates before making a decision.

Key Finding


Two of the three phases have experienced timelines extending beyond the dates originally declared in promoter filings.

Milestone

Promised

Actual/Current status

Timeline Variance

Phase I Possession

30 Sep 2020

27 Nov 2024

4 years, 2 months

Occupation Certificate

β€”

31 Mar 2023

Approx. 2.5 years

Physical Handover

β€”

27 Nov 2024

Approx. 20 months after OC

Phase II OC

β€”

Unconfirmed

Pending verification

Phase III Completion

30 Sep 2025

30 Mar 2027 (extended)

18 months

Myreviewhub takeaway: The record indicates a pattern of timeline extensions across multiple phases. Buyers should review the latest HARERA filings and current project status before making a purchase decision.

πŸ”΄ 3. Only 2 of 7 Towers Delivered β€” Construction Activity Will Continue for Years

As of this review, only two of the project’s seven planned residential towers have been delivered. The remaining five towers are still under construction, with Phase III currently carrying an extended completion timeline up to March 2027.

Residents who took possession in late 2024 should expect ongoing construction activity within the project for the foreseeable future, including:

β€’ Construction machinery and related site activity

β€’ Construction dust and material movement

β€’ Heavy vehicle movement associated with ongoing development

In addition, construction of the 28.5 km Gurugram Metro corridor commenced in May 2025 and is expected to continue over multiple years. The combination of ongoing project construction and major public infrastructure works is likely to influence the living environment in the surrounding area for the remainder of the decade.

Why this matters: For end-users, the experience of living in a partially completed township can differ significantly from the finished-product vision presented in marketing material. Buyers should assess not only the delivered towers but also the timeline and potential impact of the remaining construction phases before making a purchase decision.

πŸ”΄ 4. The Site Is Permanently Bisected by a 24-Metre Public Road

This is one of the most consequential physical planning features of Godrej Meridien. The project’s master plan is divided by a 24-metre-wide public road that separates the residential towers from the proposed community retail and neighbourhood school components. As a public road, it forms part of the wider area infrastructure and is not under the exclusive control of the developer.

The significance of this road is reflected in the official HARERA proceedings relating to the Phase III registration. During hearings conducted on 10 February 2020, HARERA recorded that the proposed 24-metre-wide access road had not yet been constructed and that access was being provided through a temporary 18-metre-wide culvert arrangement. The proceedings further noted that the road alignment passed through both the project land and adjoining land parcels owned by other developers, meaning its completion depended on factors beyond Godrej’s sole control.

HARERA subsequently granted the registration subject to the submission of a sworn affidavit undertaking completion of the road prior to possession. The affidavit was submitted in November 2019.

Why this matters: Buyers should understand that the project’s residential, retail and community components are separated by a public road rather than being contained within a single uninterrupted internal township layout. This is a permanent planning feature that may influence walkability, internal movement and the overall township experience.

Feature

Buyer Consideration

24m public road through township

Internal connectivity

Retail & school across road

Walkability

650 sq. yd. revenue parcel

Land verification

Revenue road near clubhouse

Amenity access environment

Adjacent private land

Future development risk

Additionally, the Building Plan Approval (Form BR-III) issued by DTCP Haryana contains the following condition:

“The revenue Rasta, if any, passing through the site shall be kept unobstructed.”

This condition indicates that any existing Revenue Raasta (public access route) within the project area must remain accessible and cannot be blocked by the developer. Buyers expecting a completely private, self-contained township should independently evaluate how this planning feature may affect the overall layout and movement within the development.

πŸ”΄ 5. Drainage and Basement Seepage Concerns

The Dwarka Expressway corridor has faced recurring discussions around drainage infrastructure and water management, particularly during periods of heavy rainfall. Multiple government agencies have acknowledged ongoing stormwater drainage works across the region, with certain infrastructure projects extending into 2026.

At Godrej Meridien, resident reviews and online discussions have raised concerns regarding water seepage in lower basement parking areas. Prospective buyers should inspect basement levels personally, particularly during or immediately after the monsoon season, and seek clarification from residents and project management regarding any ongoing waterproofing, pumping or drainage measures.

Potential implications of persistent seepage may include higher maintenance requirements, additional water-management costs and increased waterproofing needs over the long term.

Why this matters: While project amenities and finishes are visible during a site visit, drainage performance is often best assessed during adverse weather conditions. Buyers should therefore conduct additional due diligence on water-management arrangements before making a purchase decision.

πŸ”΄ 6. Proposed C&D Waste Processing Plant Near Sector 106

The Municipal Corporation of Gurugram (MCG) has proposed a Construction & Demolition (C&D) waste facility in the Babupur area of Sector 106. Local media reports indicate that preliminary fencing activity was initiated at the proposed site, triggering opposition from resident groups and RWAs.

Screenshot of a Times of India article reporting resident opposition to proposed C&D waste processing facilities in Sectors 103 and 106, Gurugram.
Source: Times of India (February 2026). Report covering resident opposition to the proposed C&D waste facilities in Sectors 103 and 106, Gurugram.
Screenshot of a Times of India article stating that MCG planned a C&D waste collection facility in the Babupur area of Sector 106 and that fencing work had begun at the proposed site.
Source: Times of India (February 2026). Report on the proposed C&D waste facility in Sector 106 and the resident opposition that followed.

Source: Times of India (February 2026).

Read the full article: Can’t allow mounds of debris: Residents of new sectors in Gurgaon protest C&D waste plants

Residents opposing the proposal have cited potential concerns relating to dust generation, truck movement, environmental impact and overall quality of life if such a facility were to become operational in the area.

Status at the Time of Review

The facility remains a proposal and buyers should independently verify its current status through official MCG records before making any purchase decision.

Why this matters: Large-scale waste processing facilities can become an important locational factor for homebuyers. While the final impact would depend on the plant’s design, operating standards, regulatory approvals and eventual location, prospective buyers should monitor developments closely and assess any implications for the surrounding neighbourhood.

πŸ”΄ 7. Maintenance Charges β€” Official Figure vs Buyer Sentiment

The officially listed Common Area Maintenance (CAM) charge for Godrej Meridien is β‚Ή3.68 per sq. ft. per month, as per project documentation.

A buyer review posted on MouthShut (June 14, 2021) stated:

β€œMaintenance charges are going to be very high which they are not disclosing now, it will be equal to the rent of a 2BHK builder floor.”

Source: MouthShut review dated June 14, 2021

This is included strictly as an individual buyer’s opinion from a public forum and does not represent verified maintenance billing data.

Buyers are advised to independently verify actual maintenance costs by reviewing current bills from existing residents, along with the full CAM breakup (security, clubhouse, utilities, and other services) and any escalation clauses in the agreement.

The β‚Ή3.68 per sq. ft. figure represents the official disclosed CAM rate, while actual monthly outgoings may vary depending on apartment size and applicable service components.

🟑 8. Phase II OC Status β€” Unconfirmed

As of the time of this review, the Occupancy Certificate (OC) for Phase II towers could not be independently verified on the H-RERA portal by MyReviewHub.

An Occupancy Certificate is the government-issued document that confirms a building has received the necessary approvals for occupation. Buyers should always verify the OC status of the specific tower they are considering before making any purchase decision.

If a valid OC has not been issued, there may be implications relating to occupancy, financing, utility connections, resale, and legal compliance. Buyers are advised to seek clarification directly from the developer and verify the status through official records.

Before proceeding with any Phase II unit, independently confirm the latest OC status through the H-RERA portal and relevant government authorities.

🟑 9. Land History β€” Licence Transfer and Original Licensees

According to Licence No. 18 of 2008 and the DTCP Licence Transfer Approval Letter dated 11 May 2017 (documents linked below), the project land in Village Babupur was originally licensed to M/s Rainbow Promoters Pvt. Ltd. and M/s Valleyside Developers Pvt. Ltd. Godrej Real View Developers Pvt. Ltd. subsequently became the project developer through a DTCP-approved licence transfer process in 2017.

DTCP licence excerpts mentioning the names of the licence holders
Source: DTCP Haryana Licence Records (2008 Licence and 2017 Transfer Approval)

πŸ“„ Original Licence No. 18 of 2008 β€” DTCP Haryana, Form LC-V, dated 2 February 2008. View Original Document on HARERA Website β†’

Transfer of licence in favour of Godrej Real View Developers Pvt. Ltd.
DTCP Haryana β€” Licence Transfer Order, Memo No. LC-1017-PA(SN)-2017/9321, dated 11 May 2017. Transfer of Licence No. 18 of 2008 to Godrej Real View Developers Pvt. Ltd. Signed by Ravi Sihag, District Town Planner (HQ), DTCP Haryana.

πŸ“„ Licence Transfer Order β€” Memo No. LC-1017-PA(SN)-2017/9321, dated 11 May 2017, DTCP Haryana. View Original Document on HARERA Website β†’

This is not unusual in real estate, but it does mean the project has a longer development history than many buyers may realise.

What buyers may wish to verify before signing:

  • Whether the land title is clear and free from disputes
  • Whether the licence transfer documents are properly recorded
  • Whether any obligations attached to the original licence have been completed
  • Whether the project company mentioned in your agreement is the same entity shown in H-RERA records

🟑 12. What the Official RERA Specifications Actually Say

The specifications filed with H-RERA (Form H) are the legally committed specifications for the project. Buyers should rely on these documents and their sale agreement rather than marketing material alone.

SpecificationH-RERA Form H
Bedroom flooringLaminated wooden flooring
WardrobesNot included
Kitchen appliancesNot included
Air conditioningProvision only (units not supplied)
Wi-FiProvision at one location
Main doorFlush door with veneer finish
CNG pipelineNot applicable

Several features commonly seen in sample apartments or promotional material may not form part of the legally committed specifications. Before signing, buyers should verify all promised fittings, appliances, and finishes against both the H-RERA filing and their individual sale agreement.rely on the H-RERA specification sheet and the signed agreement when evaluating what is contractually included with the apartment.

Builder Track Record

Godrej Properties is one of India’s most recognised listed real estate developers, with a large national presence and significant institutional backing. Those strengths are real and form part of the project’s appeal.

At the same time, buyers should evaluate the execution record of this specific project independently of the brand name.

For Godrej Meridien Phase I, possession was delivered substantially later than the timeline originally committed under RERA. H-RERA orders relating to delay compensation are part of the public record and should be reviewed by prospective buyers.

Buyer concerns regarding delays and communication were also raised publicly during the project period, including in resident discussions and public videos available online.

The broader lesson for buyers is simple: a strong brand can reduce certain risks, but it does not eliminate project-specific risks relating to timelines, infrastructure, approvals, or external development conditions.

πŸ“ Buyers may also review publicly reported issues and buyer discussions relating to other projects in the Dwarka Expressway region to understand how infrastructure dependencies can affect project timelines and resident experience. Each project, however, should be evaluated on its own merits and circumstances.

Price & Investment Considerations

Metric

Godrej Meridien

Market Observation

Launch Price (2021)

β‚Ή9,000–9,500 per sq. ft.

Positioned at a premium to many competing projects in the corridor at launch

Current Resale Asking Prices

β‚Ή15,000–18,500 per sq. ft.

Buyers should compare with recent transaction prices and competing projects

Resale Inventory

Significant resale inventory visible on major property portals

Indicates an active secondary market

Rental Inventory

Large number of units available for rent

Rental yields should be independently verified

Infrastructure Dependency

Strong linkage to Dwarka Expressway and sector development

Future performance remains tied to external infrastructure execution

Godrej Meridien carries a clear brand premium and luxury positioning within the Dwarka Expressway corridor. Buyers evaluating resale opportunities should compare current asking prices with competing projects, recent transaction values, and achievable rental yields rather than relying solely on listing prices.

Investment view: The project offers premium amenities, a recognised developer brand, and a strategic corridor location. However, long-term outcomes will also depend on infrastructure delivery, sector development, and inventory absorption. Buyers should independently verify recent resale transactions, rental yields, and occupancy levels before making any investment decision.

Who Should Buy This

This Project May Work for You If:

  • You are buying a Phase I unit and have physically inspected the property, surrounding roads, and existing infrastructure.
  • You are comfortable with a long-term holding period and the ongoing development of the Dwarka Expressway corridor.
  • You have spoken with existing residents and are satisfied with the on-ground reality, including access roads, maintenance, and occupancy levels.
  • You have reviewed the sale agreement, title documents, and relevant H-RERA records before committing.
  • You have obtained a written breakdown of current maintenance charges and other recurring costs.

This Project May Not Suit You If:

  • You require possession within a fixed and non-negotiable timeframe and have not independently verified the status of the specific phase or tower you are considering.
  • You are highly sensitive to ongoing construction activity, dust, or noise associated with a large phased development.
  • You prefer a fully established neighbourhood with completed infrastructure and minimal surrounding construction.
  • You depend heavily on public transport and expect metro connectivity in the immediate vicinity.
  • You are relying primarily on the developer brand without reviewing the project’s regulatory filings, approvals, and on-ground conditions.
  • You require complete certainty regarding future maintenance costs and infrastructure timelines.

Godrej Meridien Sector 106 Review β€” Our Assessment

In this Godrej Meridien Sector 106 Review, the core decision is not really about location or builder credibilityβ€”both are already well established. The real question is whether buyers are comfortable paying a noticeable premium over nearby alternatives for the benefits of the Godrej brand, project quality and community ecosystem.

Our Call: A STRONG PROJECT β€” BUT PHASE MATTERS

βœ… MyReviewHub Verdict: PHASE I β€” REASONABLE BUY | PHASE II & III β€” VERIFY BEFORE COMMITTING
The access-road issue appears in official HARERA records, and later phases have seen timeline extensions. Phase I is a completed and occupied product, while buyers in later phases should independently verify current construction progress, possession timelines and site conditions before making a commitment. phase’s RERA filing before you decide.

Godrej Meridien is not a simple “buy” or “avoid” project. Our research found meaningful differences between the phases.

Phase 1 is a completed and occupied product from a well-established developer, making it a relatively straightforward end-use consideration. Later phases carry a different risk profile due to timeline extensions and evolving on-ground conditions.

For most buyers, the key decision is not whether Godrej Meridien is a good project overall, but which phase they are buying into and whether that phase matches their timeline and expectations.

H-RERA Verification β€” Check the Records Yourself

MyReviewHub verified all three RERA registrations directly on haryanarera.gov.in. You can do the same.

FieldPhase IPhase IIPhase III
RERA NumberGGM/273/2018/05GGM/274/2018/06GGM/393/125/2020/09
Registration Date18.05.201818.05.201810.02.2020
PromoterGodrej Real View Developers Pvt. Ltd.SameSame
Original Completion30.09.202030.09.202030.09.2025
Covid Extension29.03.202129.03.202131.03.2026
HARERA ExtensionExt. No. 28 of 2024Ext. No. 14 of 2024Ext. No. 04 of 2026 (12.02.2026)
Current Deadline28.03.202528.03.202530.03.2027
OC Statusβœ… Obtained 31.03.2023❌ Not confirmed❌ Not yet applicable
Towers CoveredTowers 1, 2 + EWS + CommercialTower 3Towers 4, 5, 6, 7 + Nursery School
Units327 + 11 commercial134428
πŸ“ŒΒ  Verify Yourself: Visit haryanarera.gov.in β†’ Project Search β†’ Enter the RERA number for your specific phase. Always verify which tower belongs to which phase before booking β€” your RERA number, possession rights, and legal remedies depend on it.

MyReviewHub research is based primarily on official RERA filings, regulatory orders, hearing proceedings and other publicly available government records. Wherever possible, we verify information from primary sources rather than relying solely on marketing material or property portals.MyReviewHub policy: Every review is based on primary source verification. We read the actual RERA filings, hearing proceedings, and official government documents β€” not just the builder’s website.

Share Your Experience

Have you bought, visited, or lived in Godrej Meridien Sector 106? Your honest experience β€” good or bad β€” helps other buyers make better decisions. Leave your review below.

There are no reviews yet. Be the first one to write one.

πŸ”—πŸ”— Sources & References

This Godrej Meridien Sector 106 Review is based on RERA filings, government records, media reports and publicly available buyer feedback reviewed by MyReviewHub.

Government & Regulatory

  1. HARERA Portal β€” Phase I (GGM/273/2018/05), Phase II (GGM/274/2018/06), Phase III (GGM/393/125/2020/09) β€” haryanarera.gov.in
  2. Registration Continuation Certificate β€” RC/REP/HARERA/GGM/5 of 2018/7(3)/83/2025/25, dated 27 August 2025
  3. Extension Certificates β€” No. 28 of 2024 (Phase I) Β· No. 14 of 2024 (Phase II) Β· No. 04 of 2026 (Phase III)
  4. Occupancy Certificate β€” Phase I Towers 1 & 2, DGTCP Haryana, 31 March 2023
  5. Licence No. 18 of 2008 β€” DTCP Haryana, dated 2 February 2008
  6. Licence Transfer Order β€” Memo No. LC-1017-PA(SN)-2017/9321, DTCP Haryana, 11 May 2017
  7. Building Plan Approval β€” Memo No. ZP-1128/AD(RA)/2018, DTCP Haryana, 21 March 2018
  8. MCA21 β€” Godrej Real View Developers Pvt. Ltd., CIN: U45309MH2016PTC285438

News Reports 9. Times of India β€” “Pay 11% interest to buyer for delay in handover of flat, Haryana Real Estate Regulatory Authority rules”, 2 December 2025 (H-RERA order against Godrej Real View Developers β€” Complaint No. 5869/2024) 10. Times of India β€” “Showers cause flooding on Dwarka Eway service roads, underpass shut”, 11 August 2024 11. Times of India β€” “Now flooding virus spreads to Dwarka E-way’s service road in Gurgaon”, 31 July 2025 12. Hindustan Times β€” “Heavy rain causes severe waterlogging in Gurugram, traffic affected”, 27 June 2024 13. CAQM β€” Gurugram dust inspection report, December 2025

Public Records & Buyer Sentiment 14. YouTube β€” Buyer protest, Godrej Meridien Sector 106, 10 November 2024 15. MouthShut / Reddit r/gurgaon β€” public forum buyer discussions, 2021–2026 (opinion, not verified fact) 16. Housing.com β€” resale listing observations, May 2026 (snapshot only)

⚠️ Disclaimer

This review is based on publicly available information, including official RERA filings on haryanarera.gov.in, the promoter’s sworn affidavit (Form REP-II), published news reports, and buyer feedback from public forums. MyReviewHub has not received any payment from Signature Global, any associated entity, or any channel partner for this review. This is an independent editorial review.

Information is accurate as of May 2026 but property situations change β€” always verify current status independently before making any purchase decision. The OC verification status marked above should be confirmed directly with GMDA or MCG Gurugram before purchase.

This review does not constitute legal or financial advice. For RERA complaints or compensation claims, consult a RERA-registered advocate.

Β© MyReviewHub | India’s Most Honest Property Reviews | myreviewhub.com

Considering Signature Global City 37D?

Book a free site visit through MyReviewHub. We’ll connect you with a verified channel partner β€” because you deserve facts on the ground, not promises on paper.

Book a Site Visit β†’

Learn more about our Review Methodology

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *