Signature Global City 37D Review: What Buyers Must Verify Before Signing in 2026

Signature Global Sector 37D review hero image β€” RERA verified independent review 2026 by MyReviewHub

βœ… MyReviewHub Verdict: PROCEED β€” BUT VERIFY FIRST
Timeline extensions and public buyer concerns around infrastructure readiness
make on-ground verification important before purchase.

This verdict is based on information available at the time of research. Always conduct your own due diligence before making any purchase decision.

This Signature Global Sector 37D review is based entirely on official RERA documents, government filings, and verified media reports β€” not builder brochures.

Project at a Glance

ParameterDetails
Project NameSignature Global City 37D β€” Phase 1
DeveloperSignatureglobal Developers Pvt. Ltd.
LocationVillage Gaduli Kalan, Sector 37D, Gurugram
RERA NumberGGM/463/195/2021/31 dated 13.07.2021
RERA Project IDRERA-GRG-877-2021
Project TypeIndependent Floors β€” DDJAY Scheme
Total Units632 residential + 212 commercial
Configuration2 BHK & 3 BHK Independent Floors
Price Rangeβ‚Ή1.16 Cr – β‚Ή1.48 Cr onwards
Sworn Possession Date30 September 2023
Actual StatusExtended twice β€” last extension May 2025
Verified Delay19+ months and counting
MyReviewHub Ratingβœ… 3 / 5

Location Analysis for signature global sector 37d review

The Sector 37D is a residential area that is developing fast and is located along the Dwarka Expressway. This area is surrounded by sectors like 37C and 88A, and has smooth connectivity to NH-48, Pataudi Road, and IGI Airport.

Sector 37D Gurgaon location map IGI Airport Cyber City NH-48 Manesar distance
Sector 37D in context β€” showing distance from
IGI Airport, Cyber City, and NH-48.
Source: Google Maps

Nearly 40% of the sector is developed, with 60% still under construction β€” meaning buyers are entering an area mid-development, which carries both upside potential and short-term inconveniences.

Road Connectivity

Sector 37D has direct connectivity to Dwarka Expressway and NH-8 through the famous and busy Hero Honda Chowk. This sector can be regarded as the opening gateway to the upcoming 1,000-acre Global City via the Northern Peripheral Roadβ€”which makes it an important link between old and new Gurgaon. The sector also offers access to the Southern Peripheral Road and Golf Course Extension Road through the Central Peripheral Road.

Signature Global City 37D location map Pataudi Road Dwarka Expressway, Gurgaon
Signature Global City 37D sits along Pataudi
Road in Sector 37D β€” approximately 5 minutes
from Dwarka Expressway. Source: Google Maps

In practical terms for daily commuters:

  • Cyber City / Udyog Vihar β€” approximately 20 km
  • IGI Airport β€” 20–25 minutes by road
  • NH-48 (Delhi-Gurgaon Expressway) β€” accessible via Hero Honda Chowk
  • Manesar Industrial Belt β€” approximately 30 minutes

MyReviewHub note: Road connectivity ON PAPER is strong. Road connectivity ON THE GROUND β€” particularly the internal access road issue at Signature Global City 37D β€” is a different matter entirely. See our findings in the concerns section below.

Metro Connectivity

The Union Cabinet, in June 2023, approved the Gurugram Metro Rail Project, which is supposed to increase connectivity. This will help in adding the mode as well as the speed of transportation for the daily commuters, as the proposed GMRC route has to pass through Sector 37, Gurgaon. This addition of a transportation mode will boost the economy and serve as an activity hub for the area and its people

Current reality: The metro is approved and planned β€” but not yet operational in this corridor. Buyers should treat metro connectivity as a future benefit, not a present one. The nearest operational metro station currently is Huda City Centre β€” approximately 15–20 minutes by road.

Schools Nearby

Schools such as Suncity, Narayana e-Techno, and Euro International are within the sector. Notable nearby schools include Alpine Convent, Delhi Public School, Scottish High International School, and GD Goenka World School.

For families: School infrastructure is genuinely present β€” this is not a barren area. However, most reputed schools require a 10–15 minute drive, not walking distance.

Hospitals and Healthcare

For residents of Signature Global City 37D, the healthcare picture is mixed β€” adequate for routine needs, but limited for serious emergencies.

Within the sector: The closest hospital is The Signature Advanced Super Speciality Hospital – located directly on Dwarka Expressway in Sector 37D itself, within walking distance or a 2-minute drive. Operated under the Park Hospitals group, it carries a 4.7-star rating across 5,000+ Google reviews and is available 24 hours. Residents report satisfactory surgical care and CGHS-approved billing. For day-to-day medical needs and minor emergencies, this facility is genuinely convenient.

Nearby β€” within 3 km:

  • Umang Superspeciality Hospital, Sector 37 β€” 4.7 stars, 605 reviews
  • Kamla Hospital, Pataudi Road β€” 4.3 stars, known for maternity care
  • K.D. Multi Hospital, Sector 37C β€” 4.6 stars, smaller facility

Tertiary care β€” further away: Medanta β€” The Medicity (Sector 38) is the nearest top-tier hospital β€” approximately 15–18 km by road. In typical Gurgaon traffic, expect 35–50 minutes during peak hours. For serious cardiac, neurological, or oncological emergencies, this travel time is a real consideration.

MyReviewHub assessment: Healthcare access is adequate but not exceptional for a developing sector. The on-site super-speciality hospital covers most routine and semi-urgent needs. For critical emergencies requiring top-tier care, the 35–50 minute drive to Medanta in real traffic conditions is a genuine limitation that families should take into consideration while taking a decision.

Shopping and Daily Life

For residents of Signature Global City 37D, the shopping and daily life picture is practical β€” adequate for everyday needs, but limited when it comes to variety and leisure.

Within the sector: Daily essentials are covered by small grocery outlets, pharmacies, and society‑run convenience stores. These are genuinely useful for routine purchases, but options remain basic. Residents often rely on delivery services for broader product ranges, which are well supported in this part of Gurgaon.

Nearby β€” within 3–5 km:

  • Sapphire 83 Mall on Dwarka Expressway β€” the closest organized retail hub, with supermarkets, fashion outlets, and casual dining.
  • Sector 9 & Sector 10 markets β€” traditional markets offering fresh produce, household goods, and affordable shopping.
  • NH‑48 retail clusters β€” small commercial strips with electronics, furniture, and daily‑use shops.

Larger retail & leisure β€” further away: Ambience Mall and other major malls in central Gurgaon are roughly 20–30 minutes by road. These provide branded outlets, multiplexes, and fine dining, but travel time in peak traffic can be a consideration.

MyReviewHub assessment: Shopping and daily life in Sector 37D are smoothly operating and steadily improving. The daily requirement items are easily available within the sector, but for more diverse and high-end products, one has to travel to malls or larger markets, which are a little distance away. For residents, this means routine convenience is well covered, but lifestyle shopping and entertainment still require travel. Families should factor in this balance when considering the sector β€” everyday needs are met locally, but variety and leisure options remain dependent on nearby hubs.

Property Price Trends β€” The Investment Case

This is where Sector 37D genuinely impresses. Sector 37D property rates have shown consistent appreciation. As per recent price trends, the locality has recorded roughly 8.2% year-on-year appreciation. MyReviewHub verified current price trends for Sector 37D on NoBroker.com in May 2026. The data shows approximately 110% appreciation in 2 BHK prices over the past three years, with current per square foot rates ranging between β‚Ή5,500 – β‚Ή12,222.

The price trends of the last 10 years show significant growth β€” the average price in 2012 was Rs. 3,855 per sq ft, rising to Rs. 6,393 per sq ft by 2022. For long-term investors, Sector 37D has delivered real returns on the investments.

Who Else Is Building Here β€” Competition Landscape

Before you commit to Signature Global City 37D, it is worth mentioning that you can avail yourself of more options in this sector, which seem to be quite impressive, too. Of late, BPTP and Ramprasthaβ€”other builders of reputeβ€”both have ready-to-move-in flats in this sector too. It means that you can get the possession immediately without waiting, unlike Signature Global.

Also, here Navraj and ROF have almost similar offerings at competitive prices. That’s why, to balance it out for the interested ones who want to move in immediately in this sector, they don’t have to feel disappointed, as these alternatives may still succeed in pulling you in.

What Could Make This Area More Valuable

The future of Sector 37D is bright β€” with the opening of Dwarka Expressway, ongoing metro rail progress, new business hubs like the pending Global City site nearby, and continuing residential projects creating further momentum. Road and area infrastructure are also being improved by widening roads and adding new underpasses, cycling lanes, and connections that will shorten travel times.

Sector 37D is a gateway to the upcoming 1,000-acre Global City via NPR β€” making it a pivotal link between old and new Gurgaon.

The Global City project β€” a planned 1,000-acre integrated township β€” is the single biggest long-term value driver for this entire corridor. If it develops as planned, early buyers in Sector 37D could see significant appreciation.

MyReviewHub Location Verdict

FactorAssessmentRating
Road connectivity (paper)Excellent β€” Dwarka Expressway, NH-48βœ… Strong
Road connectivity (ground)Developing β€” internal roads are still an issue🟑 Work in progress
Metro connectivityFuture β€” approved but not operational🟑 Wait and watch
SchoolsGood β€” Euro International, DPS nearbyβœ… Good
HospitalsGood β€” Medanta accessible, local hospital presentβœ… Good
Price appreciationExcellent β€” 110% in 3 yearsβœ… Strong
Future potentialHigh β€” Global City, metro, expresswayβœ… Strong

Bottom line on location: Sector 37D is genuinely one of Gurgaon’s better long-term bets. The location story is real β€” the corridor appreciation, the expressway access, the schools and hospital nearby. The problem with Signature Global City 37D is not the sector. it is the developer’s inability to deliver on time, what was promised within it. As of mid-2025, the road connecting the society to Dwarka Expressway remained unresolved β€” nearly a year after residents moved in. This is not a minor inconvenience. It directly affects daily commutes, emergency vehicle access, resale value, and quality of life.

What We Liked

βœ… RERA Registered β€” Verified MyReviewHub confirmed this project’s registration directly on haryanarera.gov.in (Project ID: RERA-GRG-877-2021). In their RERA registration filing, Signature Global declared that major statutory approvals were in place before launch β€” including water supply (GMDA), sewage disposal (GMDA), electricity load (DHBVN), and Forest NOC. These are the builder’s own declarations to the regulator. Buyers can verify the original filing directly on haryanarera.gov.in.

βœ… Competitive Pricing for the Location At β‚Ή1.16 Cr for a 2 BHK independent floor near the Dwarka Expressway, the pricing is competitive for Gurgaon’s current market. Independent floors in more established sectors along the same corridor are priced significantly higher β€” making Sector 37D one of the more affordable entry points into this area. For a long-term buyer with patience, the location-to- price equation has genuine merit.

βœ… DDJAY Scheme Coverage The project falls under the Deen Dayal Jan Awas Yojana β€” a government affordable housing framework that brings regulatory oversight and price controls. This structure limits how much a builder can charge and offers buyers a layer of policy protection beyond standard RERA.

βœ… Listed Developer, IFC-Backed Signature Global completed its IPO in 2023 and is listed on NSE. It is backed by IFC (International Finance Corporation), a World Bank group entity. A listed company faces public scrutiny, mandatory disclosures, and regulatory oversight that unlisted developers do not β€” this is a meaningful, if not unconditional, positive.

βœ… Escrow Account Declared As committed in their sworn affidavit filed with Haryana RERA, buyer funds are to be held in a dedicated IndusInd Bank scrow account (A/c: 250025003701), with 70% of all receipts deposited and withdrawable only in proportion to construction completion β€” requiring certification by an engineer, architect, and chartered accountant. Whether this commitment was fully honored in practice cannot be verified without accessing the project’s financial audit reports.

What Concerned Us

πŸ”΄ 1. Possession Delayed by 19+ Months β€” Sworn Date Missed

This is the foundational fact of this review β€” and it comes from official documents, not buyer complaints. In their sworn affidavit (Form REP-II) submitted to Haryana RERA on 16 June 2021, Signatureglobal Developers Pvt Ltd declared under oath:

“The time period within which the project shall be completed by promoter is 30/09/2023.”

The project subsequently received two official RERA extensions:

  • Extension 1: No. 28 of 2023, dated 04 December 2023 β€” first deadline missed
  • Extension 2: No. 11 of 2025, dated 06 May 2025 β€” second deadline missed

The project appears substantially complete and operational with active occupancy, although buyers should independently verify the latest OC/CC and compliance status. The project had a confirmed 19+ month delay on a sworn legal commitment β€” documented on the official RERA portal, available for anyone to verify.

What buyers can do: Under RERA Section 18, allottees are entitled to compensation for delays at the SBI MCLR rate. If you have booked and are affected, consult a RERA-registered lawyer immediately.

πŸ”΄ 2. Sworn Affidavit Contradicts Their Own RERA Filing on Land Ownership

This is the most serious finding in this review β€” and we uncovered it by cross-referencing two official RERA documents filed by Signature Global itself.

What they swore in their affidavit (Form REP-II, June 2021): “M/s Signatureglobal Developers Private Limited has a legal title to the land admeasuring 15.502 Acres on which the development of the project is proposed.”

What they declared in their own RERA Form B (filed simultaneously): Under Question 6 β€” “Is the applicant owner-licensee of the land?” β€” the answer is clearly: No.

The same form identifies the actual landowners as:

  • Lalwani Brothers Buildcon LLP β€” New Rajendra Nagar, New Delhi
  • Unistay Hospitality Pvt Ltd β€” Vasant Kunj, New Delhi

Signatureglobal Developers Pvt Ltd is the development collaborator β€” not the land owner. Their collaboration agreement is registered, so the arrangement is legally structured. But the sworn affidavit’s claim of “legal title” directly contradicts their own Form B declaration filed in the same RERA application.

Why this matters for buyers: In any future dispute β€” about possession, refunds, or compensation β€” the question of who legally owns the land becomes critical. Buyers should have a RERA lawyer review the exact chain of title before signing any agreement.

πŸ”΄ 3. Road Connectivity Approval Was NOT Obtained at Launch β€” Then Sworn to Obtain

This finding requires reading two documents together.

In RERA Form C (filed at registration), under approvals for external connecting services, the entry for ROADS clearly states: No. Storm Water Drainage approval was also missing.

In their sworn affidavit (Point 8), the promoter declared: “M/s Signatureglobal Developers Private Limited shall take all the pending approvals on time, from the competent authorities.”

They launched the project without road connectivity approval. They swore to obtain all pending approvals on time. The road was never properly delivered.

The consequences were documented publicly: on 15 August 2025 β€” India’s Independence Day β€” approximately 150 residents staged a protest outside the society. The developer had promised four 24-metre-wide roads connecting the society to Dwarka Expressway. One road was constructed but subsequently blocked because the land belongs to a government agency. The remaining access is a 700-meter potholed revenue road with an open drain on one side and agricultural fields on the other β€” causing accidents.

Source: IANS (@ians_india), August 16, 2025

πŸ“° Times of India reported on the blocked road and residents’ grievances. Read the report β†’

πŸ“° Hindustan Times covered the protest β€” 150 residents, Independence Day, no roads delivered. Read the report β†’

MyReviewHub could not find any official response from Signature Global to the protest or to residents’ grievances about road connectivity. If the developer has responded publicly, we would be glad to update this section β€” write to us at [support@myreviewhub.com]

πŸ”΄ 4. Project Land Carried a Rs. 22.58 Crore Loan at Launch

The sworn affidavit discloses that at the time of RERA registration, the project land was hypothecated to Vistra ITCI India Limited (acting as security trustee on behalf of IndusInd Bank) for Rs. 22.58 Crores β€” by way of hypothecation on sold and unsold receivables of the project land.

Signature Global affidavit hypothecation clause Rs 22.58 crore IndusInd Bank HRERA filing
Extract from sworn affidavit filed by Signatureglobal Developers Pvt Ltd, notarised June 16, 2021, as submitted to HRERA at project registration.
πŸ“„ Download Full Affidavit (PDF)

Simply put, the land had a significant loan charge against it when buyers started paying. This was disclosed in the affidavit β€” which is legally correct conduct β€” but most buyers are unaware that their payments were going into a project where the underlying land asset carried a prior financial charge.

πŸ”΄ 5. Self-Certified OC β€” Government Approval Status Unclear

As per the HRERA project portal accessed in May 2026, the current status for this project is “Extension Certificate Uploaded.” MyReviewHub could not independently confirm receipt of an Occupancy Certificate from the primary HRERA portal. Prospective buyers are strongly advised to verify OC status directly at haryanarera.gov.in before making any decision.

An OC is not a formality. It is the legal document confirming a building is structurally safe and legally fit for occupation. Without a valid government-issued OC, residents technically occupy at their own risk, banks may refuse final loan disbursements, and resale becomes legally complicated.

🟑 6. Buyer Sentiment Online

Buyer discussions across public forums including MouthShut, Reddit and property communities, show mixed reactions regarding Signature Global City 37D Phase-1. While several residents appreciate the low-rise layout, spacious units and improving connectivity near Dwarka Expressway, some buyers have raised concerns related to infrastructure readiness, maintenance responsiveness and post-possession finishing quality.

These observations are based on publicly available user discussions and should not be treated as independently verified facts.

🟑 7. Marketing Positioning vs RERA Specifications

Public marketing material and portal listings for SIGNATURE GLOBAL CITY 37D – 1 position the project as a premium low-rise independent floor township with lifestyle-oriented amenities. However, the construction specifications disclosed in the project’s RERA Form-H reflect largely standard mid-segment specifications at the time of registration filing. We are reproducing the specifications exactly as disclosed in the RERA filing:

FeatureRERA-Filed Specification
FlooringVitrified & Ceramic Tiles
Wall FinishOBD Paint
Air ConditioningNot Applicable (NA)
WiFi / BroadbandNot Applicable (NA)
Modular WardrobesNot Applicable (NA)
CNG PipelineNot Applicable (NA)
Main & Internal DoorsFlush Doors
Kitchen CounterGranite

At the time of the original RERA registration, several amenity-related components were also marked as β€œYet to be Prepared,” including:

  • Electricity supply system
  • Security and fire fighting
  • Playgrounds and parks
  • Clubhouse / community centre
  • Shopping area
  • School
  • Hospital / dispensary

This does not necessarily mean these amenities were never delivered later. However, buyers should compare:

  • brochure representations,
  • marketing claims,
  • actual on-ground delivery,
  • and RERA-filed disclosures
    before making a purchase decision.

Buyers who purchased based on brochure renderings showing world-class amenities should cross-check what has actually been delivered against what was legally committed in the RERA filing.

🟑 8. The Project Was Registered Under a Separate Legal Entity

The RERA filing for Signature Global City 37D was submitted under: β€œSignatureglobal Developers Pvt Ltd”. In Form G of the filing, the promoter declared:

β€œProjects launched by the promoter in last five years: No Projects.”

At the same time, the broader Signature Global group had already launched and delivered multiple residential projects in Gurugram under different group entities and SPVs. This distinction matters because buyers legally transact with the specific entity named in the agreement β€” not only the parent brand marketed in advertisements.

Large developers commonly use separate entities for different projects. However, buyers should still review:

  • the exact legal entity signing the agreement,
  • financial strength of that entity,
  • and whether project-level liabilities sit with the SPV or parent group

🟑 What Signature Global Filed with RERA β€” And What Changed Later

This section is based on the sworn declarations and project filings submitted by Signatureglobal Developers Pvt Ltd to Haryana RERA in June 2021. We reviewed the original registration documents, extension filings and continuation approvals available on the Haryana RERA portal.

Original RERA FilingWhat Happened Later
Project completion by 30/09/2023Timeline later extended through continuation/extension approvals
Project spread across 15.502 acresProject developed through disclosed collaboration/development arrangements
Multiple infrastructure and amenity commitments proposedSeveral components were marked β€œYet to be prepared” at the time of registration
Premium-style marketing across property platformsRERA-filed specifications largely reflect standard mid-segment construction specifications
Statutory compliance and escrow commitments filed under RERABuyers later raised public concerns around execution timelines and infrastructure readiness

The differences between the original filings and the current project status are visible in publicly available RERA records and subsequent project updates.

Builder Track Record

Signature Global Group was founded in 2014 in Gurugram and has grown into one of Delhi NCR’s most active residential developers in the affordable and mid-housing segment. Its 2023 NSE IPO was a significant milestone β€” bringing listed-company accountability, IFC (International Finance Corporation) backing, and institutional scrutiny that purely private developers do not face. According to publicly available data, the company holds approximately 13% market share in Delhi NCR and around 27% in Gurugram’s residential micro-markets.

These are real positives. A listed company with institutional investors cannot easily walk away from its obligations the way an unlisted developer can. That accountability matters.

However, execution is where the pattern becomes harder to ignore. On 15 August 2025 β€” India’s Independence Day β€” residents of two separate, independently RERA-registered Signature Global projects staged protests simultaneously. Residents of Signature Global City 37D Phase 1 in Sector 37D protested over undelivered road connectivity. On the same day, residents of Signature Global Park in Sector 37 β€” a different project with its own RERA registration β€” protested over near-identical grievances: undelivered 24-metre roads, poor construction quality, and absent maintenance services.

Two projects. Two RERA registrations. One day. Identical complaints.

This review documents the specific findings for City 37D Phase 1 only. But buyers considering any Signature Global project should weigh the brand’s financial credibility against its documented execution record β€” and verify the current status of promised infrastructure before committing.

Price vs Market

ConfigurationSignature Global 37DMarket Range (Sector 37D)Verdict
2 BHK Independent Floorβ‚Ή1.16 Cr onwardsβ‚Ή1.10 – β‚Ή1.40 CrIn line with market
3 BHK Independent Floorβ‚Ή1.48 Cr onwardsβ‚Ή1.40 – β‚Ή1.80 CrCompetitive

Pricing is in line with the micro-market and competitive compared to similar projects in the Dwarka Expressway corridor. The sector has seen consistent appreciation over the past 3 years as infrastructure has improved.

Investment angle: The location has genuine long-term merit. If road connectivity is resolved β€” through GMDA intervention or legal pressure β€” and the area continues developing, early buyers could see appreciation. The risk is timeline uncertainty and the ongoing gap between promised and delivered conditions.

Risk-adjusted view: Buyers must factor in that they may wait an additional 1–2 years for infrastructure to settle, face potential legal costs if pursuing RERA compensation, and carry the uncertainty of an OC that has not been clearly verified as government-issued.

Who Should Buy This

This project MAY work for you if:

  • You are a long-term buyer or investor with a 4–5 year horizon
  • You are comfortable with a developing micro-market where some infrastructure is still evolving
  • You have personally visited the site and spoken with existing residents about their experience
  • You have carefully reviewed the sale agreement, possession status and maintenance structure before booking
  • You are purchasing at pricing that fairly reflects the current stage of the project and surrounding infrastructure

Avoid this project if:

  • You need immediate possession or rental income within the next 12 months
  • You are looking for a fully ready move-in environment for end-use with family
  • You are not comfortable with projects where surrounding infrastructure and execution timelines are still evolving
  • You prefer fully completed projects with clear occupancy and maintenance visibility
  • Your purchase decision is based primarily on marketing material without reviewing the actual specifications and current on-ground status

Our Call: PROCEED β€” BUT VERIFY FIRST

Road connectivity, OC status, and a conversation with current residents β€” verify all three before you sign anything.

The project is delivered and largely occupied. The location has appreciated over the past few years, and the overall township fundamentals appear genuine.

However, before making a purchase decision, buyers should carefully check three things:

  • current road connectivity and surrounding infrastructure on the ground,
  • updated OC/possession status directly through Haryana RERA and local authorities,
  • and feedback from existing residents alongside the developer’s sales presentation.

If these factors align with your expectations, the project can be a reasonable end-use option at current pricing. However, buyers who prioritise fully mature infrastructure and completely settled execution may want to evaluate alternative ready-to-move options as well.

RERA Verification β€” Do It Yourself

We verified this project directly on haryanarera.gov.in. You can too.

FieldVerified Data
RERA Registration No.GGM/463/195/2021/31
RERA Project IDRERA-GRG-877-2021
Registration Date13 July 2021
DeveloperSignatureglobal Developers Pvt Ltd
Sworn Completion Date30 September 2023
Extension 104 December 2023
Extension 206 May 2025
Current StatusExtension Certificate Uploaded
Affidavit (Form REP-II)Verified β€” dated 16 June 2021

Verify yourself: Go to haryanarera.gov.in β†’ Search Project β†’ Enter ID: RERA-GRG-877-2021

MyReviewHub policy: Every review is based on primary source verification. We read the actual RERA filings β€” not just the builder’s website.

Share Your Experience

Have you bought, visited, or lived in Signature Global City 37D? Your honest experience β€” good or bad β€” helps other buyers make better decisions. Leave your review below.

There are no reviews yet. Be the first one to write one.

πŸ”— Sources & References

  • Haryana RERA Portal β€” haryanarera.gov.in, Project ID RERA-GRG-877-2021
  • RERA Forms A-H β€” Signatureglobal Developers Pvt Ltd, filed June 2021
  • Form REP-II Promoter Affidavit β€” Signatureglobal Developers Pvt Ltd, dated 16 June 2021, attested by Notary Public Prem Lal, Reg No. 033/06, NCT of Delhi
  • Hindustan Times β€” “150 Signature Global City residents hold protest against builder”, 16 August 2025
  • Times of India β€” “No road to condo, Gurgaon buyers protest against developer”, 16 August 2025
  • IANS β€” Signature Global Park protest report, 15 August 2025

⚠️ Disclaimer

This review is based on publicly available information, including official RERA filings on haryanarera.gov.in, the promoter’s sworn affidavit (Form REP-II), published news reports, and buyer feedback from public forums. MyReviewHub has not received any payment from Signature Global, any associated entity, or any channel partner for this review. This is an independent editorial review.

Information is accurate as of May 2026 but property situations change β€” always verify current status independently before making any purchase decision. The OC verification status marked above should be confirmed directly with GMDA or MCG Gurugram before purchase.

This review does not constitute legal or financial advice. For RERA complaints or compensation claims, consult a RERA-registered advocate.

Β© MyReviewHub | India’s Most Honest Property Reviews | myreviewhub.com

Considering Signature Global City 37D?

Book a free site visit through MyReviewHub. We’ll connect you with a verified channel partner β€” because you deserve facts on the ground, not promises on paper.

Book a Site Visit β†’

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top